Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 16 páginas
Examen

ACI Concrete Field Testing Technician- Grade I Questions and Answers

Document preview thumbnail
Vista previa 3 fuera de 16 páginas

ACI Concrete Field Testing Technician- Grade I Questions and Answers

Vista previa del contenido

ACI Concrete Field Testing Technician-
Grade I Questions and Answers16

The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete. - ANSWERS-3 in. [75 mm]



The temperature measuring device shall have a capacity of measuring temperature of freshly
mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANSWERS-1
degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]



The temperature measuring device shall be calibrated _____, or whenever there is a question of
_____. - ANSWERS-Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - ANSWERS-
True



The temperature of concrete may be measured in a wall form. True of False - ANSWERS-True



A composite sample of concrete is required even if the only purpose for obtaining the sample is
to determine temperature. True of False? - ANSWERS-False



What must be done to the sample container prior to sampling the concrete? - ANSWERS-
Dampen (with water)



What must be done to the concrete surrounding the temperature measuring device after the
device is submerged in the fresh concrete. - ANSWERS-Gently press the concrete around the
temperature measuring device at the surface of the concrete

,How long must the temperature measuring device remain in the freshly mixed concrete? -
ANSWERS-At least 2 minutes but not more than 5 minutes



After the temperature of the concrete is read, what is required? - ANSWERS-Reporting of
temperature



The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - ANSWERS-1
degree F [0.5 C]



According to ASTM C1064, what is one reason to take the temperature of concrete? - ANSWERS-
Verify conformance to a specified requirement for temperature of concrete



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? -
ANSWERS-False



The sample of concrete used for temperature determination must be rodded 25 times. True or
False? - ANSWERS-False



Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - ANSWERS-Compliance



This method covers sampling from four types of mixtures which are _____, _____, _____, and
_____. - ANSWERS-Stationary mixers, paving mixers, revolving drum mixers, and open top
mixers



The maximum allowable time between obtaining the first and final portions of a composite
sample is _____ minutes. - ANSWERS-15



Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the
sample. True of False? - ANSWERS-True

, The maximum elapsed time allowed between obtaining the final portion of the composite
sample and beginning the tests for slump, temperature, and air content is _____ minutes. -
ANSWERS-5



The molding of strength test specimens shall begin within _____ minutes after fabricating the
composite sample. - ANSWERS-15



The concrete sample must be protected from contamination and _____. - ANSWERS-Rapid
evaporation



The minimum size sample for making strength test specimens is _____. - ANSWERS-28 L (1ft^3)



When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly
spaced intervals during discharge of the middle portion of the batch - ANSWERS-2



The composite sample for a paving mixer must represent a minimum of _____ different portions
of the batch of concrete taken from the pile after discharge. - ANSWERS-5



When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of
_____ regularly spaced intervals during discharge of the middle portion of this batch. -
ANSWERS-2



Concrete samples from a truck mixer must be obtained before any water or admixtures are
added to the mixer at the job site. True or False? - ANSWERS-False



The composite samples from a truck mixer must be obtained from the _____ portion of the
batch. - ANSWERS-Middle

Información del documento

Subido en
14 de mayo de 2026
Número de páginas
16
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
wanjejer1900
2.0
(1)
Vendido
7
Seguidores
0
Artículos
1411
Última venta
3 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes