QSP Updated Questions and Answers
(2026/2027) | Practice Review | A+
Verified
The person in charge of the utility company, municipality, or other public or private
company or agency that owns or operates the __________ may also serve as the LRP.
-✓✓LUP

Sediment basins, at a minimum, shall be designed according to the CASQA
Construction BMP Guidance Handbook. -✓✓True

In the RUSLE equation, "P" stands for -✓✓Management operations and support
practices.

Management operations and support practices. -✓✓Management operations and
support practices.

When does risk level one has to sample? -✓✓When required for non-visible pollutants.

ATS instruments shall record which of the following? -✓✓Flow, turbidity, and pH

Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? -
✓✓K and LS

Failure to obtain coverage under the permit for storm water discharges to waters of the
US is a violation of the -✓✓Clean Water Act and California Water Code

For traditional construction projects the LRP may be -✓✓The person who possesses
real properly interest in the land upon which the construction activities will occur for the
regulated site

What does NTU measure? -✓✓a measurement of optical properties of a liquid that
cause light rays to be scattered and absorbed rather than transmitted in straight lines
through a sample.

Inspection Records have to be kept until the project is complete or three years,
whichever comes first. -✓✓False

Which factor(s) of RUSLE must be changed to recalculate risk when the construction
duration has changed? -✓✓R

BMP stands for -✓✓Best Management Practice

, Do type 1 LUPs typically have a high potential to impact storm quality? -✓✓No

What does RUSLE stand for? -✓✓Revised Universal Soil Loss Equation

A discharger must notify the Regional Water Boards if there are planned changes in the
construction activity that -✓✓May result in non-compliance

A qualifying storm event is -✓✓A rain even that produces 1/2 inch or more of
precipitation with a period of 48 hours or more between rain events.

Continuous monitoring (no less than 15-min intervals) of ATS is required for: -✓✓

Rain Event Action Plan must be developed by a QSD -✓✓False

The CGP allows for not monitoring under what conditions? -✓✓Dangerous weather
conditions, unsafe storm event, and outside of scheduled operations.

What is the difference between erosion and sedimentation? -✓✓Erosion is the
dislodging and transport of soil and sedimentation is the deposition of material.

CSMP stands for -✓✓Construction Site Monitoring Program

What weather forecast would trigger a reap? -✓✓50% chance of rain, within 48 hours.

During routine inspection a LUP discharger observes a non-stormwater discharge and
therefore must prepare a non storm water report. -✓✓UNSURE* but: False (no non-
stormwater report exists?)

What BMP does the permit discourage? -✓✓Plastic cover (maybe sediment basin?)

What factors are used for RUSLE? -✓✓R, K, LS, C, P

Which two best represent an ATS "mode of operation"? -✓✓Flow through and Batch
treatment

What does NPDES stand for? -✓✓National Pollutant Discharge Elimination System

When shall a discharger conduct a construction site evaluation and run-on evaluation? -
✓✓Whenever the results from a storm event daily average indicate that the discharge is
below the lower NAL for pH, exceeds the upper NAL for pH, or exceeds the turbidity
NAL.

Información del documento

Subido en
13 de mayo de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
PassHub
5.0
(1)
Vendido
7
Seguidores
1
Artículos
2185
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes