Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12)

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12)

Vista previa del contenido

ACI Certification- Concrete Field
Testing Technician Grade 1 CP-1
(12)19

ASTM C1064 - ANSWERS-Standard Test Method For Temperature of Freshly Mixed Hydraulic-
Cement Concrete



The sensor of the temperature measuring device shall be submerged a minimum of ______
inches into the freshly mixed concrete. - ANSWERS-3"



The temperature measuring device shall have a capacity of measuring temperature of freshly
mixed concrete to ± ______ °F throughout a range of ____________. - ANSWERS-1 degree, 30
degrees to 120 degrees



The temperature measuring device shall be calibrated ______ , or whenever there is a question
of ______ . - ANSWERS-Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - ANSWERS-
True



The temperature of concrete may be measured in a wall form. True or False? - ANSWERS-True



What must be done to the sample container prior to sampling the concrete? - ANSWERS-
Dampen with water



What must be done to the concrete surrounding the temperature measuring device after the
device is submerged in the fresh concrete? - ANSWERS-Close off air voids by gently pressing the
concrete around the device

,How long must the temperature measuring device remain in the freshly mixed concrete? -
ANSWERS-minimum of two minutes, maximum of five minutes



The temperature of the concrete is reported to the nearest ______ °F - ANSWERS-1 degree



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? -
ANSWERS-False



ASTM C172 - ANSWERS-Standard Practice for Sampling Freshly Mixed Concrete



Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - ANSWERS-Compliance



This method covers sampling from four types of mixers, which are _____ , _____ , _____ , and
_____ . - ANSWERS-Stationary mixers, paving mixers, revolving drum mixers and open top
mixers



The maximum allowable time between obtaining the first and final portions of a composite
sample is _____ minutes. - ANSWERS-15



Portions of a composite sample shall be thoroughly remixed before beginning tests on the
sample. True or False? - ANSWERS-True



The maximum elapsed time allowed between obtaining the final portion of the composite
sample and beginning the tests for slump, temperature, and air content is _____ minutes. -
ANSWERS-5

, The molding of strength test specimens shall begin within _____ minutes after fabricating the
composite

sample. - ANSWERS-15



The concrete sample must be protected from contamination and _____. - ANSWERS-Rapid
evaporation



The minimum size sample for making strength test specimens is _____. - ANSWERS-1 cubic foot



When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly
spaced intervals during discharge of the middle portion of the batch. - ANSWERS-2



The composite sample for a paving mixer must represent a minimum of _____ different portions
of the batch of concrete taken from the pile after discharge. - ANSWERS-5



When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of
_____ regularly spaced intervals during discharge of the middle portion of the batch. -
ANSWERS-2



Concrete samples from a truck mixer must be obtained before any water or admixtures are
added to the mixer at the job site. True or False? - ANSWERS-False



The composite sample from a truck mixer must be obtained from the _____ portion of the
batch. - ANSWERS-middle



When the concrete contains aggregate larger than that permitted for a particular test method,
the sample of concrete must be _____ _____ before making the test. - ANSWERS-wet sieved

Información del documento

Subido en
10 de mayo de 2026
Número de páginas
18
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
wanjejer1900
2.0
(1)
Vendido
7
Seguidores
0
Artículos
1411
Última venta
3 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes