LADOTD Highway Plan Reading I Exam Questions With Correct Answers

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

LADOTD Highway Plan Reading I Exam Questions With Correct Answers

Vista previa del contenido

LADOTD Highway Plan Reading I Exam
Questions With Correct Answers

1-1a: The CONTRACT covering the construction project is a(n) _____ between
| | | | | | | | | | |


LADOTD and the contractor. - CORRECT ANSWER✔✔-Written agreement
| | | | | | |




1-1b: Which document asks the contractor to submit a cost bid for a project? -
| | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-Invitation to Bid
| | |




1-1c: Contractors base their bid on the materials and labor necessary to construct
| | | | | | | | | | | |


the highway project. Which document tells the contractor WHAT to construct and
| | | | | | | | | | | |


WHERE to construct it? - CORRECT ANSWER✔✔-Plans
| | | | | | |




1-1d: List the three categories regarding specs for a project - CORRECT
| | | | | | | | | | | |


ANSWER✔✔-Standard, Supplemental, Special | |




1-1e: After the contractor completes an estimate, they fill out and submit a _____
| | | | | | | | | | | | |


- CORRECT ANSWER✔✔-Proposal
| | |




1-1f: The Dept issues a(n) _____ allowing the contractor to start a project. -
| | | | | | | | | | | | | |


CORRECT ANSWER✔✔-Notice to Proceed
| | |




1-1g: What can change the contract after the start of the project? - CORRECT
| | | | | | | | | | | | | |


ANSWER✔✔-Plan Changes/Special Agreements | |

,1-1h: Which documents are the most referenced when used to inspect; what,
| | | | | | | | | | | |


where, and how the contractor builds? - CORRECT ANSWER✔✔-Plans
| | | | | | | |




1-1i: Record the name of the document the project engineer prepares when a
| | | | | | | | | | | | |


change in plans is required. - CORRECT ANSWER✔✔-Change Orders
| | | | | | | |




Occasionally, a contractor must preform extra work, to complete the project.
| | | | | | | | | | |


Prior to the contractor performing the work, the Chief Engineer signs a _______. -
| | | | | | | | | | | | |


CORRECT ANSWER✔✔-Change order
| | |




1-2a: Which specs apply to only a specific project under contract? - CORRECT
| | | | | | | | | | | | |


ANSWER✔✔-Special Provisions |




1-2b: What specs apply to all projects? - CORRECT ANSWER✔✔-Standard Specs
| | | | | | | | | |




1-2c: Special directions applicable to specific projects are _____. - CORRECT
| | | | | | | | | | |


ANSWER✔✔-Special Specs |




1-2d: A revision or amendment to the Standard Specs is a ______. - CORRECT
| | | | | | | | | | | | | |


ANSWER✔✔-Supplemental Specs |




1-3a (1-4): List the PROCEDURAL ORDER TO FOLLOW with regard to the
| | | | | | | | | | | |


clarification of possible contract discrepancies. - CORRECT ANSWER✔✔-1.
| | | | | | | |


Special, 2. Plans, 3. Supplemental, 4.Standard
| | | | |

, 1-4a: To read a set of plans it is important to accurately _____ and understand
| | | | | | | | | | | | | | |


what is meant by each drawing an notation. - CORRECT ANSWER✔✔-Interpret
| | | | | | | | | |




1-4b: The plans indicate ____ to build and _____ to build a project. - CORRECT
| | | | | | | | | | | | | | |


ANSWER✔✔-What and Where | |




1-4c: Sheets within a set of plans _____ to each other. Info pertaining to a
| | | | | | | | | | | | | | |


particular feature of the project often appears on more than one sheet. -
| | | | | | | | | | | | |


CORRECT ANSWER✔✔-Relate |




1-4d:It is very important to keep a plan set _____ and in _____. - CORRECT
| | | | | | | | | | | | | | |


ANSWER✔✔-Clean and in order | | |




2-2a. There are two types of project numbers used to identify a project. (DRAIN
| | | | | | | | | | | | | |


CANAL BRIDGES ON US HWY 90) - CORRECT ANSWER✔✔-Federal, State
| | | | | | | | |




2-4a. List the three things on the Title Sheet that identify a project. (DRAIN
| | | | | | | | | | | | | |


CANAL BRIDGES ON US HWY 90) - CORRECT ANSWER✔✔-State Project #, Federal
| | | | | | | | | | | |


Project #, Project Name
| | |




2-6a. List three places on the Title Sheet that indicate the State Project Number.
| | | | | | | | | | | | | |


(DRAIN CANAL BRIDGES ON US HWY 90) - CORRECT ANSWER✔✔-Project Caption,
| | | | | | | | | |


|Title Block, Layout Map
| | |




2-8. Prefix Acronyms such as STP, I, BR, etc are ______. - CORRECT ANSWER✔✔-
| | | | | | | | | | | | |


Federal-funding categories |

Información del documento

Subido en
7 de mayo de 2026
Número de páginas
23
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectphilip
4.0
(41)
Vendido
278
Seguidores
6
Artículos
26130
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes