PCC Paving Inspection LADOTD Exam Questions With Correct Answers

Vista previa del contenido

PCC Paving Inspection LADOTD Exam Questions
With Correct Answers


For edges not along longitudinal joints, the surface within the 6 inches adjacent
| | | | | | | | | | | | |


to the edge shall not vary more than - CORRECT ANSWER✔✔-1/4"
| | | | | | | | | |




Conventional forms will not be required at slab edges along longitudinal joints,
| | | | | | | | | | | |


provided the surface within the 6 inch width adjacent to the edge does not vary
| | | | | | | | | | | | | | |


more than - CORRECT ANSWER✔✔-1/8"
| | | |




Texturing of the concrete is to be done using a _______ and a ________ texturing
| | | | | | | | | | | | | |


device - CORRECT ANSWER✔✔-carpet drag; metal tine
| | | | | | |




The carpet drag must be reasonably free from indentions over - CORRECT
| | | | | | | | | | | |


ANSWER✔✔-1/16" deep |




In slip form paving, the drag is usually attached to the - CORRECT ANSWER✔✔-
| | | | | | | | | | | | |


longitudinal float machine | |




Two approved methods of floating are - CORRECT ANSWER✔✔-mechanical and
| | | | | | | | | |


hand held |




The longitudinal tube float is set at a __ angle to the centerline of the slab. -
| | | | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-45 degree | |

,Following the mechanical, longitudinal tube float, the _____________ float may
| | | | | | | | | |


be used to smooth and fill open textured pavement areas. - CORRECT
| | | | | | | | | | | |


ANSWER✔✔-hand held |




The vibratory, longitudinal bull float is only used - CORRECT ANSWER✔✔-over
| | | | | | | | | | |


joints


T/F Excess water and loose material should be removed from the surface with a
| | | | | | | | | | | | | |


10 foot, metal, static straightedge. - CORRECT ANSWER✔✔-True
| | | | | | |




T/F The handle of a straightedge must be approximately 5 foot longer than 1/2
| | | | | | | | | | | | | |


the width of the pavement slab. - CORRECT ANSWER✔✔-False
| | | | | | | |




T/F When working the straightedge, the blade is first worked at a 45 degree angle
| | | | | | | | | | | | | |


to the centerline and then with the blade parallel to the centerline. - CORRECT
| | | | | | | | | | | | | | |


ANSWER✔✔-True


T/F The straightedge operations should advance along the concrete slab in
| | | | | | | | | | |


successive stages of 5 feet. - CORRECT ANSWER✔✔-True
| | | | | | |




T/F When performing straightedge operations, water may be thrown on the
| | | | | | | | | | |


surface to make the work easier. - CORRECT ANSWER✔✔-False
| | | | | | | |




If the application of water to the concrete surface is permitted during finishing
| | | | | | | | | | | | |


operations, it shall be applied as - CORRECT ANSWER✔✔-fog spray
| | | | | | | | |

, Screeds yield the _____ grade of the concrete slab - CORRECT ANSWER✔✔-initial
| | | | | | | | | | |




_________ finishing will be required on all highway pavements or _____,
| | | | | | | | | | |


regardless of width. - CORRECT ANSWER✔✔-Machine; ramps
| | | | | |




Under what conditions will hand finishing be permitted? - CORRECT ANSWER✔✔-
| | | | | | | | | |


1. If mechanical equipment breaks down. 2. Pavement not a principal highway
| | | | | | | | | | | |


and width does not exceed 16 ft. 3. Area has regular dimensions.
| | | | | | | | | | |




T/F A strike off bar is used to level the concrete. - CORRECT ANSWER✔✔-True
| | | | | | | | | | | | |




T/F Prior to concrete placement and the paver in place, th DOTD Inspector should
| | | | | | | | | | | | |


use a string line to make sure the strike off is true to line. - CORRECT
| | | | | | | | | | | | | | | | |


ANSWER✔✔-True


T/F A toothed rake is used for leveling concrete. - CORRECT ANSWER✔✔-False
| | | | | | | | | | |




T/F Vibrators must be operated at least 20 seconds in each place. - CORRECT
| | | | | | | | | | | | | |


ANSWER✔✔-False


T/F Over vibration of the concrete mixture will cause the mortar to rise to the top
| | | | | | | | | | | | | | |


surface of the pavement slab. - CORRECT ANSWER✔✔-True
| | | | | | | |

Información del documento

Subido en
7 de mayo de 2026
Número de páginas
19
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectphilip
4.0
(41)
Vendido
278
Seguidores
6
Artículos
26130
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes