• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 44 páginas
Examen

NEBOSH NCC1 Test with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Document preview thumbnail
Vista previa 4 fuera de 44 páginas

NEBOSH NCC1 Test with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Vista previa del contenido

NEBOSH NCC1 Test with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
1. Construction
Transitory nature of workers
is-sues
Temporary nature of construction activities and the constantly
changing work-place
Time pressures from clients and principal contractors
Weather conditions
Levels of numeracy and literacy of
workers Non-English speaking
2. High risk workers
areas for
Falls from height
injuries in Slips, trips and falls
construction Being struck by falling/moving objects
Manual handling
3. Construction Apply to all construction projects
(Design and Duties placed on clients, designers and all construction workers
Management)
Regulations
2007

4. CDM regs - notifi- Construction phase will last longer than 30 days
able projects Construction phase will involve more than 500 person days at work

5. Duty holders Client - have most influence
for notifiable
Designers - have responsibility beyond construction phase
pro-jects Contractors - competence
CDM Co-ordinator - advise client of their duties, co- ordinates others
Principal contractor - safe working, co- ordination and co-operation
between contractors

6. CDM client duties Appoint competent persons
Ensure suitable mgmt of welfare
Allow suflcient time and
1/
44

,NEBOSH NCC1 Test with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
resources Provide pre-
construction info




2/
44

, NEBOSH NCC1 Test with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
Appoint duty holders for notifiable projects
Retain and provide access to health and safety
file
7. CDM co-
ordina-tor Advise and assist client with their duties
CDM duties Notify HSE
Co-ordinate H&S aspects of design work and co-operate with others
Facilitate good communication
Liaise with principal contractor re ongoing
design Pass on pre-construction
information Prepare/update H&S file

8. Designer Check client is aware of their duties
CDM duties Eliminate hazards and reduce risks during
design Provide information about remaining
risks
Check CDM co-ordinator has been
appointed Provide any information needed
for H&S file

9. Principal contrac- Plan, manage and monitor construction phase
tors CDM duties Prepare, develop and implement a written plan and site rules
Give contractors relevant parts of the plan
Provide suitable welfare facilities Check
competence of all appointees
Site inductions and further info and training
Consult with workers
Liaise with CDM-c Secure
the site

10. Contractor Check client aware of duties
CDM duties Plan, manage and monitor own work and that of
workers Check competence
3/
44

, NEBOSH NCC1 Test with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
n own employees
mply with part 4 of CDM regs




4/
44

Información del documento

Subido en
6 de mayo de 2026
Número de páginas
44
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$19.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Studyclub
3.6
(14)
Vendido
70
Seguidores
1
Artículos
13606
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes