Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

SEDIMENTATION AND EROSION CONTROL CERTIFICATION

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
01-05-2026
Escrito en
2025/2026

SEDIMENTATION AND EROSION CONTROL CERTIFICATION

Institución
NPDES
Grado
NPDES

Vista previa del contenido

SEDIMENTATION AND EROSION
CONTROL CERTIFICATION


Erosion - ans- sq sq




is the process by which land surface is worn away by the action of wind, water, and gravity.
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




Sedimentation - ans-is the settling of soil particles sq sq sq sq sq sq sq




Soil erosion is classified as either ____ erosion or ____ erosion - ans-wind , water
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




Water erosion can be classified as either ______ erosion or _____ erosion - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




overland , stream sq sq




Four processes of overland erosion - ans-
sq sq sq sq sq sq




splash erosion, sheet erosion, rill erosion, gully erosion
sq sq sq sq sq sq sq




Four principle factors influencing soil erosion are - ans-
sq sq sq sq sq sq sq sq




soil characteristics, vegetative cover, topography, climate
sq sq sq sq sq




Physical effects of erosion and sedimentation - ans-
sq sq sq sq sq sq sq




increase flooding, reduce hydraulic capacity, increased maintenance of storm water syste
sq sq sq sq sq sq sq sq sq sq




ms, increased water treatment costs, decreased recreational value
sq sq sq sq sq sq sq




Biological effects of erosion and sedimentation - ans- sq sq sq sq sq sq sq




reduced light for aquatic plants, clogs fish gills, impairs spawning, disrupts food chain, blan
sq sq sq sq sq sq sq sq sq sq sq sq sq




kets bottom, disrupts ecosystem
sq sq sq




Minimize the _______ of the area exposed at one time and the ______ of exposure - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




extent, duration sq




Apply __________ practices to protect the disturbed area from off-
sq sq sq sq sq sq sq sq sq




site runoff and to protect off-site areas from sediment damage - ans-perimeter control
sq sq sq sq sq sq sq sq sq sq sq sq




Apply ________ practices to prevent excessive on site damage - ans-erosion control
sq sq sq sq sq sq sq sq sq sq sq




Keep runoff velocities _____ and _____ runoff on site - ans-low , retain
sq sq sq sq sq sq sq sq sq sq sq sq




Stabilize disturbed areas ________ after final grading - ans-inmediately
sq sq sq sq sq sq sq sq

, Implement a thorough ____ and ____ (inspection) program - ans-maintenance, follow up
sq sq sq sq sq sq sq sq sq sq sq




Type A soils have ___ infiltration rates and ___ runoff potential. Examples - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




high, low (Sand) sq sq




Type D soils have _____ infiltration rates and _______ runoff potential. Examples - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




low, high (muck, clay) sq sq sq




Based on EPA guidance, FDEP has determined that ______ also meet the definition of con
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




struction activities - ans-demolition sq sq sq




Any type of soil disturbance over 1 acre must get ______ permit - ans-
sq sq sq sq sq sq sq sq sq sq sq sq sq




CGP (Construction Generic Permit) sq sq sq




A CGP is required for projects that disturb _____ or more acres of land - ans-1
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




The CGP permit requires inspections how often? - ans-
sq sq sq sq sq sq sq sq




weekly and within 24 hours of the end of a storm 1/2 inch or greater
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




A storm water event with a ______ hour break in between is still considered one storm wate
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




r event - ans-4
sq sq sq




The CGP permit requires sediment basins for areas _____ or more - ans-10 acres
sq sq sq sq sq sq sq sq sq sq sq sq sq




Any BPM that collects sediment must be cleaned before it reaches _____ of it's capacity -
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




ans-50%
sq




Never service construction equipment near a live stream, use storm water sewers instead
sq sq sq sq sq sq sq sq sq sq sq sq sq




T/F - ans-False sq sq




A temporary gravel construction entrance must extend the full width of the entrance. It must
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




be at least _____ ft long and _____ in thick. Aggregate should be _____ in stone or FDOT
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




No. _____ stone - ans-50, 6, 2, 1
sq sq sq sq sq sq sq




Prior to installing gravel entrance ______ should be placed on the ground and maintenanc
sq sq sq sq sq sq sq sq sq sq sq sq sq




e should be performed when the voids are full of ______ - ans-geotextile, sediment
sq sq sq sq sq sq sq sq sq sq sq sq sq




Max drainage are for a silt fence under _____ flow conditions is ____ acre per 100 ft of barri
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




er length - ans-sheet, 1/4
sq sq sq sq




The average usable life of a silt fence is ____ months - ans-6
sq sq sq sq sq sq sq sq sq sq sq sq




For proper installation of silt fence a trench ____ by _____ must be excavated. This will allo
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




w_______ of fabric to extend into the ground for back-filling and compaction - ans-4, 4, 8
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq

Escuela, estudio y materia

Institución
NPDES
Grado
NPDES

Información del documento

Subido en
1 de mayo de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$14.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DeligentSuccess Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
18
Miembro desde
10 meses
Número de seguidores
1
Documentos
1024
Última venta
2 semanas hace
Deligent testbanks store:

Welcome to deligent success:where we offer high-quality test banks and study materials designed to help you excel academically. Deligent, hard work, perseverance, excellence are the values that cause things to happen.”

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes