CSLB - PRACTICE EXAM 2 ACTUAL QUESTIONS AND ANSWERS 2025/2026 A+ GRADE.

Vista previa del contenido

CSLB - PRACTICE EXAM 2 ACTUAL QUESTIONS
AND ANSWERS 2025/2026 A+ GRADE.

Which of the following payroll taxes does not have a limit - CORRECT ANSWER -FIT



If a contractor discovers a serious code violation on an approved set of plans, which of the following stat
ement is correct - CORRECT ANSWER -
Work must stop until the contractor reports the violation and has the plans corrected



Using money from a current job to pay for unrelated project is called - CORRECT ANSWER -Diversion



An owner is having a difficult time making progress payments on time what should a contractor do to pro
tect herself - CORRECT ANSWER -The contractor should ask the owner to open an escrow account.



Which funds does the stop notice block? - CORRECT ANSWER -from the owner to the prime contractor



What is the best way for a contractor to ensure the materials were delivered at the right time to a job sit
e? - CORRECT ANSWER --Follow the critical path method



WhatYfederal forms are giving to a newly hired employee - CORRECT ANSWER -W-4 and I-9



AYclient wants the house painted and carpet installed what license classifications are/is required for this
work - CORRECT ANSWER -Painting and decoration C-33 and flooringYand floor covering C-15
classifications



An RME may act as the qualifier for no more than firms in any one-year period. - CORRECT
ANSWER - Three


Your bid on a job was accepted but you in inadvertently left out a part of that job. What should you do? -
CORRECT ANSWER -The contractor is responsible for the work


Of the following which is usually the most difficult item to estimate - CORRECT ANSWER -labor

, Except in an emergency, you must notify the regional, underground service alert, notification center no l
ess than Nor more than StartingYexcavation work - CORRECT ANSWER -
at least 2 days before and no more than 14 days before starting excavation work.



Excavators must clearly mark the boundaries of a work area, usually with paint. - CORRECT
ANSWER- white


Who furnishes MSDS sheets? - CORRECT ANSWER -supplier



If a contractor has temporary, cash flow problems, what is a good way to get through the crisis -
CORRECT ANSWER -Use funds from a pre-established line of credit.


Although, usually the largest single item in a bid, can be fairly accurately determined - CORRECT
ANSWER - Materials


WhatYis the best way to monitor labor cost - CORRECT ANSWER -
Figure out the hours from detailed time cards.



Unsafe and faulty equipment is found on a job site. What should be done - CORRECT
ANSWER - ItYis the contractors responsibility to correct the problem


How often should safety supervisor be at the job site? - CORRECT
ANSWER - It depends on the work being done.


A contractor has been turned into DOSH by an employee for safety violation. The contractor wants to fin
d out who reported the violation and asked DOSH for employees name. what will DOSH likely do -
correct answer-
Unless requested otherwise DOSH will keep confidential the name of any person making a complaint, an
d no relation may be directed atYthe employee if the employees identity is discovered



Who is responsible that safety equipment is actually put to use on the job site - CORRECT ANSWER -
Contractor

Información del documento

Subido en
1 de mayo de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$7.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
106
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes