C724 Unit 6 Test - Question and Answers | GRADED (A+)
C724 Unit 6 Test - Question and Answers 1. The six formal steps that need to be followed to develop an information system is known as what? a) Program specifications b) System development life cycle c) System analytical cycle 2. Which of the following is not an organizational change category to consider when implementing a new information system. a) Quality b) Automation c) Rationalization 3. Which method below uses fourth generation computer languages? a) End user development b) Agile c) RAD 4. What is not a development stage in the waterfall model? a) User Requirements b) Conversion c) System analysis 5. Which of the following is not a component of a feasibility Study? a) Managerial b) Technical c) Economic 6. ABC Playground Company has been asked to build a new playground for a local elementary school. The project must be completed before the first day of school. Which of the following steps would increase the likelihood of finishing the project on time? a) Assign the least experienced workers to the tasks on the critical path. b) Have the most experienced workers complete tasks on the critical path c) Evenly divide the experienced workers between all tasks for the project 7. What is UML (Unified Modeling Language)? a) UML is a general purpose modeling language b) UML is a hypertext language c) UML is a computer language, like C++ 8. Which of the following is not a key factor to consider when evaluating a system alternative? a) Compatibility b) Limitations c) Economic d) Brand 9. Which of the following is not a factor that must be considered when implementing a new information system
Información del documento
- Subido en
- 13 de mayo de 2021
- Número de páginas
- 4
- Escrito en
- 2020/2021
- Tipo
- Examen
- Contiene
- Preguntas y respuestas