• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 16 páginas
Examen

API 1169. study test questions RM-1 with complete solutions

Document preview thumbnail
Vista previa 3 fuera de 16 páginas

API 1169. study test questions RM-1 with complete solutions

Vista previa del contenido

API 1169. study test questions RM#1
with complete solutions16

According to FERC, environmental Inspectors shall have _____________ status in regards to all
other craft inspectors. - ANSWERS-Equal



According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches
must be marked with the specification, the SMYS/Grade, and pipe size. - ANSWERS-4.5



This legislation covers hazardous substance, site contamination, and cleanup - ANSWERS-
Comprehensive environmental recovery, compensation, and liability act.



A blueprint showing the exact route of a pipeline and virtually all of the knowledge that exist for
that pipeline when constructed is called a ______________? - ANSWERS-Alignment sheets



In area is considered oxygen deficient if the oxygen level is below ___________ % - ANSWERS-
19.5



During a pressure test, if a leak develops on a connection, yomust depressurize to a safe level
and then - ANSWERS-re-tighten the connections



Which listed non-destructive testing method is specified in API 1104? - ANSWERS-RT
examination



Prior to a hydrotest, ensure that the _______ has approved the de-watering location. -
ANSWERS-Environmental Inspector

,As an inspector, you should ensure that there is always a (n) on a site with an open excavation. -
ANSWERS-designated competent person



Calculate the top width of a bell hole excavation using the following information: Depth of ditch:
8 feet Bottom Width: feet Soil type: C - ANSWERS-30 : formula soil type C : 3 x depth + bottom
width = top width



Demonstrated ability to apply knowledge and skills. - ANSWERS-competence



According to the EPA, which phase covers containment, countermeasures, cleanup, and disposal
for response for oil removal after a spill. - ANSWERS-Phase III



Which refarence in 40 CFR Part 300 claifies procedures for planning and implementing off-site
response actions for hazardous substances? - ANSWERS-300.440



The color code for marking oil & gas buried utilities during sweep is _____________? -
ANSWERS-yellow



According to OSHA, excavations that are less than 5' in depth & the examination of the ground
by a competent person provides no indication of a potential cave-in, is not required to have any
type of protection system. - ANSWERS-True



MOC stands for ____________? - ANSWERS-management of change



Replica tape is used during __________ measurements? - ANSWERS-surface profile



Where can the exact code for strength test requirements be found for carbon steel (natural gas)
pipelines to operate at a hoop stress of 30% or more of SMYS? - ANSWERS-192.505

, Title 49, CFR 195: The total number of girth welds and the number nondestructively tested,
including the number rejected and the disposition of each rejected weld records must be
maintained for at least - ANSWERS-5 years



According to Title 49, CFR 192, Subpart N: Records of prior qualification and records of
individuals no longer performing covered tasks shall be retained for a period of
______________ years. - ANSWERS-5



During weld qualification, the fillet weld specimens can be broken inside the weld by any
convenient method. - ANSWERS-true



The excavation tolerance zone is __________from center-line of proposed excavation. The
excavation. - ANSWERS-24 inchs



Typically, the test pressure ratio is 1.25 and the duration is 4 hours or longer during
__________? - ANSWERS-strength test



In recards to hazardous liquids pipelines, what is the API RP that must be followed in order to
use pipe transported via railroad if it has an OD to WT ratio of 75 to 1 and that will be operated
at a hoop stress of 25% of SMYS? - ANSWERS-API RP SL1



According to OSHA, what is the maximum amount of Category 4 flammable liquids that may be
stored in any one Storage cabinet? - ANSWERS-120 gallons



The encroachment area is an area within ________________ of the existing facilities, or the
distant mandated by state law where applicable, which ever is greater. - ANSWERS-50 feet



The three main systems of pipelines according to PHMSA are - ANSWERS-Transmission,
gathering, and distribution

Información del documento

Subido en
27 de abril de 2026
Número de páginas
16
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Bensuda
3.7
(166)
Vendido
918
Seguidores
445
Artículos
23096
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes