• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 41 páginas
Examen

Nyc Site Safety Manager Exam Complete Verified Questions And Detailed Solutions Latest Update This Year-Just Released.pdf||Newest Exam!!!

Document preview thumbnail
Vista previa 4 fuera de 41 páginas

NYC Site Safety Manager Exam COMPLETE VERIFIED QUESTIONS AND DETAILED SOLUTIONS LATEST UPDATE THIS YEAR-JUST RELEASED.pdf||NEWEST EXAM!!!

Vista previa del contenido

1|Page


NYC Site Safety Manager Exam COMPLETE VERIFIED
QUESTIONS AND DETAILED SOLUTIONS LATEST
UPDATE THIS YEAR-JUST RELEASED.pdf||NEWEST
EXAM!!!


During the monthly visual inspection of the standpipe
system, the Certificate of Fitness holder notices that the
gravity tank is empty. Who should be notified? - Answer-
The manager of the building, and the FDNY Borough
Dispatcher


Which one of the following is NOT a typical primary source
of water for a standpipe system? - Answer-Siamese
connection (FDC)


The water valve that controls water flow in a sprinkler
system has a wheel and an exposed stem (if in the open
position). This valve is called: - Answer-The OS & Y valve


A Fire Department Connection (FDC) that supplies water
to standpipe system only would be colored: - Answer-Red

,2|Page


Standpipe systems are generally required in buildings
which are more than __________ feet height - Answer-75


In a fully sprinklered building, the number of extra sprinkler
heads required to be kept at the main water control valve
is: - Answer-At least 6


It is an effective means of suppressing fire, and at the
same time transmits an alarm to the Fire Department. This
stament describes: - Answer-An automatic sprinkler
system


With regard to the height of stock in a sprinklered
storeroom, it is most correct to state that the stock must be
placed: - Answer-NOT closer than 18" to the sprinkler
piping


Who is required to designate a impairment coordinator to
be responsible for complying with the Out-of-service
sprinkler system requirements of the Fire Code? - Answer-
The Building Owner

,3|Page


The Fire Brigade duties include: - Answer-. Contact FSD
for the fire details darning evacuation
. Initally report to floor below the fire, and Assist in
evacuation
. Investigate the cause for the alarm and attempting to
control spread fire


A CoF is required for a FSD for a building classified in the
Building Code as occupancy group B, occupied by: -
Answer-- More than 100 persons above the street level
- More than 100 persons below the street level
- More than a total of 500 persons in the entire building


The FSD must make sure that the hallways and stairways
are: - Answer-- Properly Illuminated
- Free from garbage accumulation
- Free from obstruction


As a general rule, during a fire most hazardous locations
in a high-rise building would be: - Answer-The fire floor
and the floor above the alarm

, 4|Page


Evacuation to ____________ or more levels below the fire
is generally adequate: - Answer-3


Fire Warden an a Deputy Fire Warden: - Answer-- Fire
prevention activities, provisions for persons w/ special
needs in a fire
- If directed, conduct evacuation of assigned floor
- Put on identifying apparel or item and account for
employees, provide for those w/ special needs, knowing
the exits and egress keeping them clear.


When is acceptable for a Building Evacuation Supervisor
to be on duty in an office building (Class B) - Answer-
When there are fewer than 100 persons in the building


Upon notification of an alarm condition or other
emergency, the FSD must report to: - Answer-The Fire
Command Station


Which of the following is NOT a duty of the FSD? -
Answer-Respond to the fire floor during an alarm condition
to investigate

Información del documento

Subido en
24 de abril de 2026
Número de páginas
41
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$25.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
11
Seguidores
0
Artículos
1752
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes