Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 33 páginas
Examen

Erosion and Sediment Control EXAMINATION SET 2026 SOLVED QUESTIONS GRADED A+

Document preview thumbnail
Vista previa 4 fuera de 33 páginas

Erosion and Sediment Control EXAMINATION SET 2026 SOLVED QUESTIONS GRADED A+

Vista previa del contenido

Erosion and Sediment Control
EXAMINATION SET 2026 SOLVED
QUESTIONS GRADED A+

● Site NOT at Final Grade. Answer: - stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


● Site at Final Grade. Answer: - stabilize in 7 days (recommended
immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw


● Minimum Standard 2. Answer: Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be stabilized
or protected with sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact
and silt fence intercepts and detains from disturbed areas

,● Minimum Standard 3. Answer: Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not
otherwise permanently stabilized (permanent vegetation shall not be
considered established until a ground cover is achieved that is uniform,
mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds
or surety


● Minimum Standard 4. Answer: First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and other
measures intended to trap sediment shall be constructed as a first step in
any land-disturbing activity and shall be made functional before upslope
land disturbance takes place


a certain amount of initial land disturbance may be required to provide
access for equipment to install the perimeter controls, but site clearing
and grading should be kept to a minimum until the perimeter controls
are in place

,intercepts and detains small amounts of sediment from disturbed areas
during construction operation to prevent sediment from leaving the site
and decrease velocity of sheet flows and low-to-moderate level channel
flow


● Perimeter Controls. Answer: assures that sediment does not leave the
perimeter of the land-disturbing area once site clearing, grading, and
construction commences


Examples: silt fences, sediment traps, sediment basins, construction
entrance, temporary diversions, diversions


● Minimum Standard 5. Answer: Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as
dams, dikes, and diversions immediately after installation


reduce erosion and sedimentation and reduce damage from sediment and
runoff to downstream or off-site areas


● Minimum Standard 6. Answer: Traps and Basins


sediment traps and basins shall be designed and constructed based upon
the total drainage area (not just disturbed area) to be served by the trap
or basin

, ● Sediment Traps. Answer: minimum storage capacity shall be 134
cubic yards per acre of drainage area and shall only control drainage
areas less than 3 acres


*stone outlet = trap*


● Sediment Basins. Answer: surface runoff from disturbed areas that is
comprised of flow from drainage areas greater than or equal to 3 acres
shall be controlled by a basin; minimum storage capacity of a sediment
basin shall be 134 cubic yards per acre of drainage area; the outfall
system shall, at a minimum, maintain the structural integrity of the basin
during a 25-year storm of 24-hour duration; runoff coefficients used in
runoff calculations shall correspond to a bare earth condition or those
conditions expected to exist while the sediment basin is utilized.


● Sediment Trapping Devises. Answer: 1. place near the lowest
drainage points of a project


2. install as a first-step measure [MS-4]


3. stabilize immediately [MS-5]


4. must include outlet protection for basins [MS-11]

Información del documento

Subido en
21 de abril de 2026
Número de páginas
33
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
716
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes