Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CDFM_MODULE_2_CERTIFICATION_EVALUATION_TEST_2026_FULL_QUESTIONS

Puntuación
-
Vendido
-
Páginas
41
Grado
A+
Subido en
20-04-2026
Escrito en
2025/2026

CDFM_MODULE_2_CERTIFICATION_EVALUATION_TEST_2026_FULL_QUESTIONS

Institución
CDFM MODULE 2
Grado
CDFM MODULE 2

Vista previa del contenido

CDFM MODULE 2 CERTIFICATION EVALUATION
TEST 2026 FULL QUESTIONS AND CORRECT
ANSWERS ALREADY PASSED GRADED A+

◉ Which cost estimating method is based on direct comparison
which is historical information? Answer: Analogy Approach


◉ Th more you do something, the more efficient you get at it is
called what? Answer: Learning Curve


◉ The government remains responsible, maintains control over
management decisions, but another entity operates or provides the
services? Answer: Outsourcing


◉ The process aimed at shifting functions & responsibilities (in
whole or part) from government to private sector (i.e. family
housing)? Answer: Privatization


◉ Cost estimating approach, statistical method, top down approach?
Answer: Parametric Appraoch


◉ Re-Engineering team should be no more than ____ people, and
should include a mix of competencies and experiences. Answer: 10

,◉ What is measuring performance against the "best" and adapting
best practices called? Answer: Bench Marking


◉ What Business Process is a radical redesign of key business
processes? Answer: Re-Engineering


◉ Database that summaries forces, resources, & equipment
associated with programs approved by SECDEF? Backbone of the
PPZB&E. Answer: Future Years Defense Program (FYDP)


◉ Actual Cost of Work Performed < Budgeted Cost of Work
Performed = Favorable or Non Favorable? Answer: Favorable


◉ Actual Cost of Work Performed>Budgeted Cost of Work
Performed = Favorable or Non Favorable? Answer: Non-Favorable


◉ Describe an Economy Order. Answer: It is used for routine
services, usually recurring, work done in house, incrementally
obligated as earned, must obligate by fiscal year end or return funds.


◉ Which 2 very similar Cost Estimating Methods happen early in the
process? Answer: (1) expert opinion approach; subjective
judgement by an experienced individual or group;

,(2) Delphi Technique - expert opinion from a group, continual
process until a consensus or near consensus


◉ What Quantifiable Benefit is a reduction in future personnel time
and effort requirements associated with a function or assigned task
that has been included in an approved program? Answer:
Productivity Improvement


◉ Initial Capabilities Document (ICD) identifies what? Answer:
Capabilities Shortfalls


◉ Foreign currency fluctuation was established to eliminate what?
Answer: Losses or gains to programs caused by fluctuation of
specified foreign currency exchange.


◉ Goldwater-Nichols identified the Charmain of Joint Chief of Staff
as the senior ranking member of? Answer: The Armed Forces


◉ The Under Secretary of Defense has oversight responsibility for?
Answer: DFAS and DCAA


◉ What/Who is the DoD's senior level forum for advising the Under
Secretary of Defense (USD) for Acquisition, Technology, & Logistics
(AT&L)? Answer: Defense Acquisition Board

, ◉ Describe a Project Order? Answer: Like a Contract, Agency MIPRs
$ to another Agency and they apply to contract, do not need to De-
obligate when appropriation expires


◉ ___________ are when funds are shifted between appropriation
accounts (O&N to PDW). Requires statutory (Congress) authority.
Answer: Transfers


◉ ____________ require the new requirement be unanticipated and be
of a higher priority than previously funded requirement. Answer:
Realignments


◉ What is the mos significant DoD law? Answer: National Security
Act


◉ The output from the PPBE Planning Phase is _________? Answer:
Defense Planning and Programming Guidance


◉ What are 2 additional tools that can be used for evaluating
contract schedule and performance? Answer: PERT Chart and Gantt
Chart


◉ Best time to reduce costs is early in the process is based on what
principle? Answer: Cost as an Independent Variable (CAIV)

Escuela, estudio y materia

Institución
CDFM MODULE 2
Grado
CDFM MODULE 2

Información del documento

Subido en
20 de abril de 2026
Número de páginas
41
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
alcorbgeneralstore Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
27
Miembro desde
6 meses
Número de seguidores
1
Documentos
14041
Última venta
1 semana hace
ALCORB STORES

ALCORB STORES

5.0

2 reseñas

5
2
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes