construction management 1


A ____ is a drawing or set of drawings produced by the contractor, supplier,
manufacturer, subcontractor, or fabricator. - answers-shop drawing

A(n) ____________________ is a physical portion of the specified product. - answers-
sample

T/F Addenda are bulletins of additional information that are germane to the contract
documents issued during the bid period. - answers-true

T/F Codes and regulations are not formally included as construction documents. -
answers-true

T/F Cost control involves containing construction costs within the budget established by
the cost estimate. - answers-true

T/F If the finish is not specified in the documents, the owner typically reviews available
finishes and makes the appropriate selection. - answers-False

Numerous systems are shown on the ___________________ drawings, such as fire
alarm, communication, or security, which may be shown on separate drawings or may
be integrated. - answers-electrical

Some common ____ include door, window, louver, and finish. - answers-schedules

T/F Structural drawings usually do not have definitive dimensions for the foundations
and structural elements. - answers-False

T/F The General Requirements section specifies the products, equipment, and systems
that are intended to be installed during the project. - answers-False

The ____ is an upper-management-level individual who is the ultimate decision maker
for the firm on the project. - answers-principal-in-charge

The ____________________ drawings are usually identified by an "A" designation. -
answers-architectural

The ____________________ is used for tracking the actual progress of the submittal. -
answers-submittal log

, The ____________________ of the project furnishes the construction documents to the
contractor for the project. - answers-owner

The conclusions from ____ cost accounting directly relate to personnel decisions,
operations methods, and the type of project that the contractor chooses to undertake in
the future. - answers-project-based

The construction project ____________________ provide a matrix of organization, with
formal and informal contractual relationships between participants. - answers-delivery
system

T/F The contractor must prioritize the submittal process, submitting and obtaining
approval for materials needed for the first part of the project. - answers-true

T/F The contractor normally stamps the submittals, indicating that they have been
reviewed. - answers-true

The contractor typically stamps the submittals to indicate that they have been
___________. - answers-reviewed

The duration of a construction project is considered ____________ because it has a
specific start date and a specific end date. - answers-finite

T/F The material size and physical characteristics, such as adjustment capabilities,
should be reviewed by both the contractor and the architect. - answers-true

The most common method for compensating the contractor, allowing for changes to the
scope of work during the construction period, is called: - answers-Lump-sum contract

The owner's daily representative during the construction project is called: - answers-The
Owner's Representative

The schedule communicates the plan to ____.
a. field personnel
b. the customer
c. subcontractors
d. all of the above - answers-D

The traditional contract project delivery system has three primary contractual parties:
the owner, the architect, and the ____. - answers-contractor

T/F The traditional project delivery system, also frequently referred to as "design-bid-
build," has been the most used project delivery system since the late 1800s. - answers-
true

Escuela, estudio y materia

Institución
101 Case Studies in Construction Management
Grado
101 Case Studies in Construction Management

Información del documento

Subido en
13 de abril de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$5.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
princessann

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
princessann stuvia
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
-
Miembro desde
1 año
Número de seguidores
0
Documentos
584
Última venta
-
princessann

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes