Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CON 101 Final Exam Study Guide

Puntuación
-
Vendido
-
Páginas
9
Grado
A+
Subido en
13-04-2026
Escrito en
2025/2026

CON 101 Final Exam Study Guide

Institución
101 Case Studies In Construction Management
Grado
101 Case Studies in Construction Management

Vista previa del contenido

CON 101 Final Exam Study
Guide



Which type of assignment is not listed on the syllabus for CON 101? - answers-Online
discussions

The Final Exam is cumulative. - answers-T

I need to email my instructor to set-up an appointment to meet during office hours. -
answers-T

The textbook for CON 101 is: - answers-Jackson, B. J. (2020). Construction
Management Jump Start (3rd ed.).

Make-up assignments will be allowed with a valid CSU/CM excuse and should be pre-
arranged with the instructor. - answers-T

According to the text, the U.S. construction industry accounts for approximately
__________ of gross domestic product.? (pp 4 -5). - answers-4.3 %

According to the text, the construction industry dates back to as early as __________ ?
(pp 4 -5). - answers-12000 BC

During which time period were craft guilds organized and formed special brotherhoods
around specific trades? (pp. 5 - 10) - answers-Middle Ages

Each industry sector requires specific expertise and familiarity in order to optimize the
construction operations and management efforts. Therefore, the majority of builders
focus their attention on only one sector or market of the industry. (pp. 10 - 20) -
answers-T

_________ homebuilders construct almost 80 percent of the homes in the United
States. (pp. 10 - 20) - answers-Production

The use of concrete casting beds, cofferdams, and slip forms are common techniques
in which industry sector? (pp. 10 - 20) - answers-Commercial Construction

, Which industry sector deals with brownfield sites (i.e. a property that is abandoned or
underused because of historic environmental contamination). (pp. 10 - 20)] - answers-
Environmental Construction

During which time period was the first building code introduced? (pp. 5- 10) - answers-
Egypt and the Pyramids

Who wrote the first design and construction handbook? (pp. 5 - 10) - answers-Marcus
Vitruvius Pollio

Which of the following is the responsibility of the Owner? - answers-Determining the
quantity, extent, and character of the project by defining the scope of work

Which of the following is the responsibility of the Design Professionals? - answers-
Assisting the owner in selecting products to fit the program and the budget

Which of the following is the responsibility of the Construction Professionals? - answers-
Oversee and manage all of the construction operations into a single, safe coordinated
effort.

Which of the following do not have a contract directly with the owner (they are often
called subcontractors). - answers-Specialty Contractors

Which of the following is NOT one of the CM major entrance requirements? - answers-
Have at least one summer of construction-related work experience

When is the Fall 2020 course add deadline (for most situations): - answers-August 30th
2020

What is the difference between "dropping" a class and "withdrawing" from a class? -
answers-When you drop a class it completely disappears from your transcript, but when
you withdraw you get a W on your transcript.

Based on the reading, which of the following type of companies is most appealing to
you? (This question is to facilitate class discussion - no points). - answers-Local
companies

Fill in the blank: According to Patrick, "Construction management (CM) entails the
planning, scheduling, evaluation, and controlling of construction tasks or activities to
accomplish specific objectives by effectively allocating and utilizing appropriate labor,
material, and time resources in a manner that minimizes costs and maximizes
customer/owner ______________. - answers-satisfaction

Which of the following is NOT listed as one who performs construction management
services? - answers-concrete finishers

Escuela, estudio y materia

Institución
101 Case Studies in Construction Management
Grado
101 Case Studies in Construction Management

Información del documento

Subido en
13 de abril de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$5.89
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
princessann

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
princessann stuvia
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
-
Miembro desde
1 año
Número de seguidores
0
Documentos
584
Última venta
-
princessann

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes