• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

CDT Exam Questions with Correct Answers

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

CDT Exam Questions with Correct Answers

Vista previa del contenido

CDT Exam Questions

Which of the following are NOT among the definitions given in Article 1 of the AIA A201? - Answer-a.
The Contract Documents

b. Order of Precedence of the Documents

c. Correlation and Intent of the Contract Documents

d. Building Information Models Use and Reliance



(B) Order of Precedence of the Documents



2. Which of the following is NOT listed as a significant difference in how public agencies dictate aspects
of the design and construction process? - Answer-a. Use of drawings and specification conventions
required by the agency

b. Processing of applications for payment.

c. Dictating how construction contracts are awarded.

d. Responsibility of design professionals to obtain competitive pricing for work results.



(D) Responsibility of design professionals to obtain competitive pricing for work results



The contractors team member who directs, manages and coordinates the day-to-day project activities of
the contractor's staff, suppliers and subcontractors is: - Answer-Superintendent



Activities that constitute the project include all of the following EXCEPT: - Answer-a. Constructing the
facility

b. Managing the completed facility

, c. Procuring materials, labor and equipment for construction

d. Designing the facility



(B) Managing the completed facility



UniFormat organizes information based upon: - Answer-Physical parts of a facility called functional
elements



The CSI Uniform Drawing System (UDS): - Answer-Establishes drawing set content and order



The contract documents come with what type of warranty under the Spearin Doctrine? - Answer-
Implied warranty



A project's sustainable design requirements may be based upon: - Answer-a. Owner driven initiatives

b. Utility rebate programs

c. Local or state regulations

d. All of the above



(D) All of the above



Who is responsible for purchase and maintenance of insurance protecting the owner against loss of use
of the owner's property or disruption of normal operations under A201? - Answer-Owner



Which of the five listed consecutive steps in the programming process are MISSING from the list below:



1. Establish goals

2. Collect and analyze facts

Información del documento

Subido en
12 de abril de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Zanaya
4.5
(12)
Vendido
78
Seguidores
29
Artículos
10176
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes