Examen

10-Cslb B License General Contractor Exam Questions And Answers 100% Pass

Document preview thumbnail
Vista previa 4 fuera de 42 páginas

10-CSLB B LICENSE GENERAL CONTRACTOR EXAM QUESTIONS AND ANSWERS 100% PASS

Vista previa del contenido

10-CSLB B LICENSE GENERAL CONTRACTOR
EXAM QUESTIONS AND ANSWERS 100% PASS

If unused mortar stiffens due to hydration of cement, what must you do? - correct answer-
Discard the mortar


What minimum time must you wait before caulking or grouting new tiles? - correct answer-24-
48 Hours


How long should you wait before installing tile on a shower pan? - correct answer-24 Hours


Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater
than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - correct answer-Type-B Soils


If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? -
correct answer-35V


In a series circuit, the total voltage is divided equally.


For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: -
correct answer-1:1 (45°)


A Pittsburgh joint is used in: - correct answer-HVAC ductwork


The drain for a pressure relief valve on a water heater should be extended to: - correct answer-
The outside of the building


What is the minimum slope toward the drain of a shower pan? - correct answer-1/4" per foot (2%)


What is the diameter of #3 rebar? - correct answer-3/8"

,If a vendor fails to provide an MSDS, you have the right to call: - correct answer-Cal/OSHA or DOSH


When installing a door jamb, you need shims at: - correct answer-
Both hinge and strike sides, three on each side.


Which of the following is used to adhere vinyl floors?


A. Epoxy cement
B. Asphalt mastic
C. Latex primer
D. White glue - correct answer-Epoxy cement


When do you need bracing for a drywall wall? - correct answer-
Diagonal bracing is needed every 25' for any drywall wall.


How should you clear the roots from a construction site? - correct answer-
Clear roots to 12" below grade.


Dividing watts by amps gives you: - correct answer-Volts


The most frequent on-the-job roofing accidents are: - correct answer-Falls


Which of the following is NOT a type of wood block flooring?


A. Parquet
B. Wood Mosaic
C. Wood Tile
D. All of the above. - correct answer-Wood tile


Lightweight concrete is best used for:

,A. Curb and Gutter
B.v Secondv floorv decking
C.v Firstv floorv slabv onv grade
D.v Footingsv -v correctv answer-Secondv floorv decking


Thev toolv usedv tov carryv groutv neededv tov patchv av smallv holev isv
a:

A.v Hawk
B.v Polingv board
C.v Spotv board
D.v Mason'sv scutchv -v correctv answer-Spotv Board


Whichv pipev isv NOTv appropriatev forv industrialv wastes?


A.v Castv iron
B.v Schedulev 40v ABSv DWV
C.v Extrav strengthv vitrifiedv clay
D.v Copperv -v correctv answer-Copper


Wherev dov youv needv av firev wall?


A.v Betweenv av livingv roomv andv av bedroom
B.v Betweenv av bedroomv andv av bathroom
C.v Betweenv av kitchenv andv av bath
D.v Av separationv wallv betweenv av dwellingv andv anv attachmentv -
v correctv answer-
Av separationv wallv betweenv av dwellingv andv anv attachment.

Whatv isv thev minimumv clearancev betweenv roughv groundv andv untreatedv subfloorv joists?v -
v1correct v answer-
8v inches


Whov mayv removev asbestos?v -v correctv answer-
Contractorv withv Asbestosv Certificationv onv license.

,v




Whichv ofv thev followingv isv NOTv likelyv tov bev foundv inv significantv proportionsv inv granularv soi
l?

A.v Gravel
B.v Sand
C.v Silt
D.v Clayv -v correctv answer-Clay


Stilesv andv railsv arev usedv onv whichv ofv thev following?


A.v Furredv walls
B.v Roofs
C.v Windows
D.v Slabsv -v correctv answer-Windows.


Av stilev isv thev verticalv edgesv ofv thev windowv andv thev railsv arev thev bottomv andv to
p.


Whatv doesv av highv slumpv testv indicate?v -v correctv answer-Toov muchv water.


Metalv concretev formsv shouldv be?

A.v Oiled
B.v Watered
C.v Placedv againstv gravel
D.v Discardedv afterv eachv usev -v correctv answer-Oiled


Whatv doesv thev Rv meanv inv av descriptionv ofv insulation?v -v correctv answer-
Resistance


Whatv kindv ofv doorv wouldv youv installv forv someonev withv av disability?

Información del documento

Subido en
10 de abril de 2026
Número de páginas
42
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Tush3161
4.9
(152)
Vendido
95
Seguidores
15
Artículos
2137
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes