⩥ The type of drawings whose purpose is to provide the owner with a
set of documents that will facilitate operation, maintenance, and future
modifications of the project throughout its useful life are called. Answer:
Record drawings
⩥ Resource drawings serve which purpose. Answer: Show construction
related to work, but which is not included in the contract
⩥ Section drawings are cut vertically through and perpendicular to
project materials to:. Answer: Show their detailed arrangement
⩥ Record drawings are:. Answer: Often required of the Contractor to
indicate changes incorporated during construction
⩥ Drawings prepared by the contractor, subcontractor, or
material/equipment supplier that show how a particular aspect of the
work is to be fabricated and installed, are called:. Answer: Shop
Drawings
,⩥ Which of these types of dimensions are likely to be included on one
drawing:A. Actual dimensionsB. Nominal dimensionsC. Modular
dimensionsD. All of the above. Answer: D. All of the above
⩥ When cross-referencing between the Drawings and Specifications the
proper term is:. Answer: the practice is discouraged
⩥ A disadvantage of repeating a requirement on both Drawing and
Specification is when a discrepancy arises:A. An addendum covering a
change in one location may overlook it in anotherB. It causes bidders to
make different interpretations o. Answer: D. All of the above
⩥ Detailed written information should appear only in the:. Answer:
Specifications
⩥ A role of specification in describing a construction project is:. Answer:
Describing administrative procedures and workmanship
⩥ Reference Drawings serve which purpose:A. Show existing work that
is to be modifiedB. Show construction related to the work, but which is
not included in the contractC. Provide the Owner with a set of
documents that will facilitat. Answer: B. Show construction related to
the work, but which is not included in the contract
, ⩥ 8. The Uniform Location of Subject Matter jointly published by the
EJCDC and AIA provides a recommended location of topics in all of the
following except:A. Supplementary ConditionsB. Division 1C.
AgreementD. Drawings. Answer: D. Drawings
⩥ When placed in the specification section, schedules are:. Answer: To
help simplify communications by using tabular form or matrix
⩥ Record Drawings are. Answer: Marked up or corrected contract
drawings that indicate changes incorporated in the Work during
construction as well as actual locations of items show diagrammatically.
the purpose of record drawings are to provide the owner a document of
the the actual construction to be used for O&M
⩥ Administrative provision of the construction contract are:. Answer:
Written in Division 1 to expand on provision in the Condition of the
Contract
⩥ Division 1 sections specify:. Answer: Administrative requirements,
procedural matters, and temporary construction facilities
⩥ Which is true regarding the Drawings?A. Have no direct relationship
to Division 1 of the specificationsB. Need not be coordinated with
Division 1C. Graphically define certain subject matter specified in
Division 1, such as Scope. Answer: F. Both C and D
WITH SOLUTIONS GRADED A+
⩥ The type of drawings whose purpose is to provide the owner with a
set of documents that will facilitate operation, maintenance, and future
modifications of the project throughout its useful life are called. Answer:
Record drawings
⩥ Resource drawings serve which purpose. Answer: Show construction
related to work, but which is not included in the contract
⩥ Section drawings are cut vertically through and perpendicular to
project materials to:. Answer: Show their detailed arrangement
⩥ Record drawings are:. Answer: Often required of the Contractor to
indicate changes incorporated during construction
⩥ Drawings prepared by the contractor, subcontractor, or
material/equipment supplier that show how a particular aspect of the
work is to be fabricated and installed, are called:. Answer: Shop
Drawings
,⩥ Which of these types of dimensions are likely to be included on one
drawing:A. Actual dimensionsB. Nominal dimensionsC. Modular
dimensionsD. All of the above. Answer: D. All of the above
⩥ When cross-referencing between the Drawings and Specifications the
proper term is:. Answer: the practice is discouraged
⩥ A disadvantage of repeating a requirement on both Drawing and
Specification is when a discrepancy arises:A. An addendum covering a
change in one location may overlook it in anotherB. It causes bidders to
make different interpretations o. Answer: D. All of the above
⩥ Detailed written information should appear only in the:. Answer:
Specifications
⩥ A role of specification in describing a construction project is:. Answer:
Describing administrative procedures and workmanship
⩥ Reference Drawings serve which purpose:A. Show existing work that
is to be modifiedB. Show construction related to the work, but which is
not included in the contractC. Provide the Owner with a set of
documents that will facilitat. Answer: B. Show construction related to
the work, but which is not included in the contract
, ⩥ 8. The Uniform Location of Subject Matter jointly published by the
EJCDC and AIA provides a recommended location of topics in all of the
following except:A. Supplementary ConditionsB. Division 1C.
AgreementD. Drawings. Answer: D. Drawings
⩥ When placed in the specification section, schedules are:. Answer: To
help simplify communications by using tabular form or matrix
⩥ Record Drawings are. Answer: Marked up or corrected contract
drawings that indicate changes incorporated in the Work during
construction as well as actual locations of items show diagrammatically.
the purpose of record drawings are to provide the owner a document of
the the actual construction to be used for O&M
⩥ Administrative provision of the construction contract are:. Answer:
Written in Division 1 to expand on provision in the Condition of the
Contract
⩥ Division 1 sections specify:. Answer: Administrative requirements,
procedural matters, and temporary construction facilities
⩥ Which is true regarding the Drawings?A. Have no direct relationship
to Division 1 of the specificationsB. Need not be coordinated with
Division 1C. Graphically define certain subject matter specified in
Division 1, such as Scope. Answer: F. Both C and D