• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Otro

Cepsci Verified Accurate Study Guide

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

CEPSCI VERIFIED ACCURATE STUDY GUIDE

Vista previa del contenido

CEPSCI VERIFIED ACCURATE STUDY GUIDE

NPDES - Answers - National Pollutant Discharge Elimination System

Clean Water Act - Answers - Administered by the EPA in 1972

Water Quality Act - Answers - Amendment to CWA in 1987 to regulate storm water
discharges under NPDES program

Point Source Pollution - Answers - Discharges from readily identifiable sources like
treatment plants

Nonpoint Source Solution - Answers - Runoff from urbanized or agricultural areas

NPDES in South Carolina - Answers - SC is a delegated state. Regulations are
administered by SCDHEC

CGP Phase II - Answers - Construction General Permit effective on September 1, 2006

NPDES Permit Coverage - Answers - 1 or more acres of land disturbance. Within 1/2
mile of a receiving water body in SC Coastal Zone

NOI - Answers - Notice Of Intent

CGP Requirements for OCRM - Answers - Coverage granted 7 days after DHEC
receives NOI

CGP Requirements for SCDOT - Answers - Coverage granted 10 days after DHEC
receives NOI

CGP Requirements for DHEC - Answers - Coverage granted 20 days after DHEC
receives completed NOI

SWPPP - Answers - Storm Water Pollution Prevention Plan, Completed prior to filing
NOI, Prepared in accordance with Phase II CGP

SWPPP Requirements - Answers - Identification of operators
Sequence of construction
Locations of all BMP's
Locations of all surface waters of state

CGP Filing - Answers - Must be in compliance with all other permits
Must comply with Federal reporting requirements
File NOT when construction is complete
Retain documentation 3 years.

, Pre Construction meeting - Answers - 10 or more acres
Explain SWPPP to all co-permittees
Contractors that are not co-permittees and the preparer must be present

Contractor Certification - Answers - Co-permittees certify that are responsible for control
of the SWPPP and have participated in a Pre-Con meeting
All Contractors that are not co-permittees must certify accountability to DHEC and a
Pre-Con meeting

EPSC Inspector Qualifications - Answers - Individuals certified by a DHEC approved
course.

Inspection Frequency - Answers - (A) At least once every 7 days, or
(B) At least once every 14 days and within 24 hours of the end of a storm event of 0.5
inches or greater
(C) Once a month if entire site is temporarily stabilized

Inspection Locations - Answers - All areas disturbed by construction activities
Areas used for materials storage exposed to precipitation
Sediment/Erosion control structures in SWPPP
All discharge locations
Nearby downstream locations
Constuction entrances

Inspection Report - Answers - 1. Date
2. Inspector credentials
3. Weather info since last report
4. Description of any discharges occuring
5. locations of discharges of sediment or pollutants
6. Location of BMPs that need maintenance
7. Location of BMPs that have failed
8. Location of additional BMPs needed
9. Corrective actions required

Notice Of Termination - Answers - Can be submitted if one of the following conditions
have been met:
1. Final stabilization has been achieved on all portions of site
2. Another operator has assumed control
3. Residential temporary stabilization in place and deed has been transferred to new
owner

Stop Work Order - Answers - Can be issued if:
Off site sedimentation resulting from non compliance
Work is being conducted without an approved SWPPP

Información del documento

Subido en
28 de marzo de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Otro
Personaje
Desconocido
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(376)
Vendido
2223
Seguidores
1450
Artículos
62835
Última venta
22 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes