• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Otro

Cepsci Verified Accurate Study Guide

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

CEPSCI VERIFIED ACCURATE STUDY GUIDE

Vista previa del contenido

CEPSCI VERIFIED ACCURATE STUDY GUIDE


Erosion - Answers - The process by which the land surface is worn away by the action
of water wind ice and gravity.

Factors contributing to erosion - Answers - Climate (rain frequency), Season (storms in
summer), vegetative cover, topography, soil characteristics.

Sedimentation - Answers - Process by which eroded material is transported and
deposited

Sedimentation effects: - Answers - reduces water clarity, fills up ponds/reservoirs,
pollutants attached to sediment impact water quality.

1972 Clean Water Act - Answers - Administered by EPA, created the National Pollutant
Discharge Elimination System (NPDES)

NPDES in South Carolina - Answers - SC is an NPDES delegated state. NPDES
regulations are administered by South Carolina Department of Health and
Environmental Control (DHEC).

epa DOES HAVE authority to exert jurisdiction in SC.

Department of Health and Environmental Control (DHEC) - Answers - state body that
administers NPDES regulations. Construction General Permit is administered by DHEC

Construction General Permit - Answers - Affects both small and large construction
activities. Must be obtained for land disturbing activities of:
- 1 acre or greater
- Less than 1 acre but within a 1/2 mile of a water body in the coastal counties)
- Less than 1 acre of total land area that is part of a larger common plan of
development if the development will end up disturbing more than 1 acre.

Operator categories: - Answers - Primary permittee: developer, land owner, site
operator, public/private entity

Secondary Permittee: Residential builder, lot owner

Contractors

lending institutions

Primary Permittee - Answers - They have operational control over Stormwater Pollution
Prevention Plan (SWPPP), construction plans, and specifications.

, typically owner or developer

How to obtain coverage under Construction General Permit: - Answers - 1. Submit a
Notice of Intent
2. Preparation of the Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP)

Secondary Permittee - Answers - Conducts land disturbing activity limited to an
individual lot or group of lots. This is Ryan Homes

Contractors - Answers - Employed by the primary or secondary permittees. Before
starting work, they must participate in pre-construction conference and complete Pre-
Construction Conference Certification Form

As well as a Contractor Certification Form

Lending Institution - Answers - If a bank or government entity takes over a site due to
forclosure, they become responsible for site discharge

Stormwater Pollution Prevention Plans - Answers - SWPPP is a site specific document
that:
- identifies sources of stormwater pollution
- describes control measure to reduce pollutants in site discharge
- identifies procedures for the operator to implement to comply with CGP

Comprehensive SWPPP vs. On-Site SWPPP - Answers - Comprehensive: includes
calculations

On-Site: includes certification forms and records/logs.

They otherwise both have a narrative, maps, sequences, and Notices of Intent

On-Site SWPPP - Answers - must be kept on site or posted near main entrance.

Must include:

1. DHEC Construction General Permit
2. Notice of Intent
3. NPDES Coverage Approval Letter
4. Pre-Construction Conference Certification Forms
5. Contractor Certifications

How long to revise an OS-SWPPP if its determined ineffective? - Answers - 7 calendar
days to make revisions.

Información del documento

Subido en
28 de marzo de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Otro
Personaje
Desconocido
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(376)
Vendido
2223
Seguidores
1450
Artículos
62835
Última venta
22 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes