Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

RIGGING TEST QUESTIONS AND ANSWERS

Puntuación
-
Vendido
-
Páginas
6
Subido en
21-03-2026
Escrito en
2025/2026

RIGGING TEST QUESTIONS AND ANSWERS

Institución
NCCCO Rigger
Grado
NCCCO Rigger

Vista previa del contenido

RIGGING TEST QUESTIONS AND
ANSWERS
As many as are required per the lift plan - answer -how many persons may share a
dedicated channel for the purpose of coordinating operations?

Proximity alarms - answer -which of the following are set to give the operator sufficient
warning to prevent encroachment of power lines?

Effective, clear, and reliable - answer -when using electronic transmission devices, the
transmitted signal must be:

Blocks installed at contact points - answer -to ensure that correct sling angles are
maintained during choker hitch use, the sling may have:

Jaw and weldless eye - answer -a turnbuckle to be used in hoisting or rigging
operations should be of what type construction?

Turnbuckle - answer -the attached drawing illustrates a device for adjustment of load
and is termed a:

Operator - answer -a signal person must be provided when the point of operation,
meaning the load travel or the area near or at load placement is not in full view of the:

Dedicated spotter - answer -when the equipment is travelling and the view in the
direction of travel is obstructed, a ____________ must be provided

Notify the crane who the signal is for - answer -for each signal, prior to giving the
function/direction, the signal person must:

Signal person, operator, lift director - answer -when non-standard signals are used, the
following people must contact each other prior to the lift operation and agree upon the
non-standard signals which are going to be used:

Distance, function, direction - answer -which of the following are the three required
elements of a voice signal?

Find the center of gravity - answer -when lifting an object that is of irregular shape, you
must always:

The operator and signal person - answer -who is allowed to design a new signal
system?

, Site conditions preclude the use of hand, voice, or audio systems - answer -en an a new
signal system be used?

The operator, signal person, and lift director - answer -who determines if a new signal
system is suitable?

The new signal system is at least equally effective communication as the standard
system being replaced - answer -what must be demonstrated prior to the use of a new
signal system?

Tower - answer -some manufactures of carrier-mounted lattice boom cranes offer
optional _________ attachments for their machines

Bridge - answer -the ___________ is the main structural member of an over head crane
used to span the width of the runway area

Hoist - answer -any overhead crane consists of three basic units; the bridge, trolley,
and:

Crawler - answer -carrier-mounted lattice boom cranes are also commonly referred to
as __________ cranes.

Load hook - answer -the crane is said to be in a particular quadrant of operation when
the ______________ is located over that area

360 - answer -in addition to using flags and barricades to show the work zone near
power lines, the employer can define the work zone area ________ degrees around the
equipment up to the equipment's maximum working radius

Block - answer -two-blocking occurs when the ___________ or headache ball makes
contact with the sheaves at the boom tip

Low - answer -industrial cranes have _____________ centers of gravity to permit
operation in narrow aisles or runways without outriggers

Front - answer -high wind speed acting on the __________ of the boom can cause it to
topple backward if it is at a high boom angle

100% - answer -whenever anything is lifted or raised from a horizontal position to a
vertical position, the crane load will be equal to _________ the weight of the object until
the object is vertical and clears the ground

Radius - answer -as a crane starts to tip, the load _________ begins to increase. This
increases the load's leverage on the crane and the tipping force

Escuela, estudio y materia

Institución
NCCCO Rigger
Grado
NCCCO Rigger

Información del documento

Subido en
21 de marzo de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Desconocido

Temas

$18.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
biggdreamer Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
274
Miembro desde
2 año
Número de seguidores
67
Documentos
18340
Última venta
1 día hace

4.0

43 reseñas

5
24
4
7
3
6
2
2
1
4

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes