Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 11 páginas
Examen

CCM test study questions and correct answers GRADED A+

Document preview thumbnail
Vista previa 2 fuera de 11 páginas

CCM test study questions and correct answers GRADED A+ CCM test study questions and correct answers GRADED A+ CCM test study questions and correct answers GRADED A+ CCM test study questions and correct answers GRADED A+ CCM test study questions and correct answers GRADED A+ CCM test study questions and correct answers GRADED A+

Vista previa del contenido

CCM TEST STUDY
QUESTIONS AND
CORRECT ANSWERS
GRADED A+ 2025-2026
What does commercial general liability cover? - ANS-Bodily injury, property damage
and false advertsing


What is a FORMAL DEMAND for compensation by the contractor? - ANS-Claim. The
phrase formal demand is what separates this from a change order.


If a structure is being built on a former brown field site. What type of insurance
coverage should the CM recommend? - ANS-Pollution Legal Liability Coverage


What is a cost plus contract? - ANS-A contract that covers project costs and contractor
markup. Aka time and materials.


Why do owners like cost plus GMP agreements? - ANS-The time of performance is
reduced.


T/F, One purpose of the general conditions is to provide a procedure for executing
changes in the work scope in a fair and equitable manner? - ANS-True


What project delivery method puts the most risk on the owner? - ANS-Multi Prime


What does substantial completion Mean? - ANS-The project is ready for occupancy in
accordance with its intended purpose.

, What is the term used to describe work that is not conforming to contract specs that
the contractor must complete prior to final payments? - ANS-Punchlist


A CM is protected from a contractor's recovery in tort due to what? - ANS-The
economic loss rule


A contractor submits a payment requisition for certification by the CM. The schedule
of values contains a new item for a change order that was submitted but has not been
approved by the owner. What should the CM do? - ANS-Reject the entire payment
requisition and require resubmission


What are the 5 key principals of sustainability? - ANS-1. Integrated design principles
2. Optimize energy performance
3.Protect and conserve water
4. Enhance indoor environmental quality
5. Reduce environmental impacts of materials


Name two pros of design-bud-build (hard bid) - ANS-1. Typically lower costs
2. Most straightforward


Name three cons of design bud build - ANS-1. May reduce quality due to lowest cost
subs and materials
2. Longer due to completing design before construction can begin
3. No architect/contractor collaboration. Design needs to be very well done.


What is the term for sum of money the contractor agrees to pay for project delays? -
ANS-Liquidated damages


What is the term used to determine how best to meet the necessary function,
performance and reliability of a project at minimum life cycle cost? - ANS-Value
Engineering

Información del documento

Subido en
15 de marzo de 2026
Número de páginas
11
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
0
Artículos
502
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes