Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 15 páginas
Examen

CM 3111 exam 1 Questions and Correct Answers/ Latest Update / Already Graded

Document preview thumbnail
Vista previa 2 fuera de 15 páginas

The _____ consist(s) of the invitation to bid, instructions to bidders, bid form, owner-contractor agreement, general conditions of the contract, supplementary general conditions, technical specifications, and the working drawings and form(s) the legal basis for the construction of the project. Ans: contract documents The _____ includes determination of the quantities and costs of everything required to complete the project. This includes the materials, labor, equipment, insurance, bonds, and overhead, as well as an estimate of profit. Ans: detailed estimate _____ involves the contractor working with the owner (or through the owner's architect-engineer) to arrive at a mutually acceptable price for the construction of the project. It often involves negotiations back and forth on materials used, sizes, finishes, and other items which affect the price of the project. Ans: Negotiated bidding

Vista previa del contenido

Page |1


CM 3111 exam 1 Questions and Correct
Answers/ Latest Update / Already Graded
The _____ consist(s) of the invitation to bid, instructions to bidders,
bid form, owner-contractor agreement, general conditions of the
contract, supplementary general conditions, technical specifications,
and the working drawings and form(s) the legal basis for the
construction of the project.

Ans: contract documents


The _____ includes determination of the quantities and costs of
everything required to complete the project. This includes the
materials, labor, equipment, insurance, bonds, and overhead, as well
as an estimate of profit.

Ans: detailed estimate


_____ involves the contractor working with the owner (or through the
owner's architect-engineer) to arrive at a mutually acceptable price for
the construction of the project. It often involves negotiations back and
forth on materials used, sizes, finishes, and other items which affect
the price of the project.

Ans: Negotiated bidding




All rights reserved © 2025/ 2026 |

, Page |2

What additional skill must the estimator have to be able to take a
quantity survey and turn it into a detailed estimate?

a. Must be able to use computer hardware and software and know how
to manipulate the various databases available or how to build
databases.

b. Must have sufficient knowledge or labor performance and
operations so that he can convert them into costs on a project.

c. Must be able, from looking at drawings, to visualize the project
through the various phases of construction.

d. All of the above

Ans: d. All of the above


_____ estimates are prepared by multiplying the square footage of a
building by a cost per square foot and then adjusting the price to
compensate for differences in the building heights, length of the
building perimeter, and other building components. These estimates
require less information to prepare and are less accurate.

Ans: Square-foot


The _____ are written instructions concerning project requirements
that describe the quality of materials to be used and their
performance.

Ans: technical specifications
All rights reserved © 2025/ 2026 |

Información del documento

Subido en
9 de marzo de 2026
Número de páginas
15
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Exampromax
5.0
(1)
Vendido
5
Seguidores
0
Artículos
1135
Última venta
2 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes