This document outlines key guidelines and principles used in architectural design and planning. It covers essential standards, design considerations, and professional practices that help guide architects in creating functional, safe, and efficient built environments.

Vista previa del contenido

Architect’s Guidelines – 2026 – Study Guide and
Reference Notes

Architect's Guidelines for Standards of Professional Practice Compliances - Methods of
Compensation and Schedule of Fees - correct answer ✔✔ UAP-IAPOA Doc. 210



Pre-Design Services - correct answer ✔✔ SPP Doc. 201



Regular Design Services - correct answer ✔✔ SPP Doc. 202



Specialized Architectural Services - correct answer ✔✔ SPP Doc. 203



Full-Time Construction Supervision Services - correct answer ✔✔ SPP Doc. 204-A



Construction Management Services - correct answer ✔✔ SPP Doc. 204-B



Post-Construction Services - correct answer ✔✔ SPP Doc. 205



Comprehensive Architectural Services - correct answer ✔✔ SPP Doc. 206



Design-Build Services - correct answer ✔✔ SPP Doc. 207



Architectural Design Competition - correct answer ✔✔ SPP Doc. 208



Professional Architectural Consulting Services - correct answer ✔✔ SPP Doc. 209

,UAP-IAPOA Doc. 210 - correct answer ✔✔ Replaced the 1979 UAP Doc. 208-b (Methods of
Compensation and Schedule of Fees)



Code of Ethical Conduct - correct answer ✔✔ SPP Doc. 200



Standards of Professional Practice - correct answer ✔✔ SPP Doc. 201-209



1. Percentage-based fee;

2. Lump sum or fixed fee;

3. Time basis - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

General classifications of methods of compensation



1. Percentage based on project construction cost;

2. Unit cost method;

3. Value-based pricing/percentage of gross rentals - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

Methods of compensation under Percentage-based fee



Percentage based on project construction cost - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

This method of compensation for architectural services is the most common worldwide. The
amount of the percentage is related to the size and the type of the Proiect



Specified percentage times the Project Construction Cost (PCC) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,]

Formula of professional fee of the architect in percentage based on project construction cost



Professional Fee - correct answer ✔✔ PF

, Project Construction Cost - correct answer ✔✔ PCC



1. Probable Project Construction Cost (PPCC)

2. Awarded Project Construction Cost (APCC)

3. Final Project Construction Cost (FPCC) - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

Charges based on a percentage of construction cost are usually determined by one of the
following methods:



Probable Project Construction Cost - correct answer ✔✔ PPCC



Awarded Project Construction Cost - correct answer ✔✔ APCC



Final Project Construction Cost - correct answer ✔✔ FPCC



Detailed Architectural and Engineering Design Services (DAEDS) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,][,4.1.1 Percentage based on project construction cost,]

Most common type of contract for architectural design services



Detailed Architectural and Engineering Design Services - correct answer ✔✔ DAEDS



Detailed Architectural and Engineering Design Services (DAEDS) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,][,4.1.1 Percentage based on project construction cost,]

This includes the architectural design and the normal basic engineering design services for
structural, plumbing, sanitary, mechanical and electrical systems. This arrangement is desirable
if the Client prefers a single point responsibility for the Project Design.



Detailed Architectural Design Services (DADS), sixty percent (60%) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,][,4.1.1 Percentage based on project construction cost,]

Información del documento

Subido en
7 de marzo de 2026
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StuviaExamHub
3.7
(93)
Vendido
507
Seguidores
356
Artículos
26959
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes