Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

Operations Management Chapter 8 Questions With Complete Solutions

Puntuación
-
Vendido
-
Páginas
3
Grado
A+
Subido en
02-03-2026
Escrito en
2025/2026

Operations Management Chapter 8 Questions With Complete Solutions

Institución
Operations Management
Grado
Operations Management

Vista previa del contenido

Operations Management Chapter 8 Questions With Complete Solutions


An orthopedic surgeon has read an article about the Toyota Production System and now wants to
organize her surgery operation based on lean principles. To eliminate all idle time in the operating room,
she decides to call in patients six hours before the scheduled surgery time. Is this a lean process? -
(ANSWER)No: The surgeon emphasizes the reduction of the waste of the resources (doctor and
operating room). However, she does this at the expense of the patient who now wastes six hours of the
flow time waiting.



Pulling the andon cord can cause a loss of output. In TPS, an employee should pull the Andon cord: -
(ANSWER)Whenever a problem occurs



What is the roof in the "house-shaped" representation of the Toyota Production System? -
(ANSWER)Waste-reduction: The roof is the reduction of waste by better matching supply with demand.



A single inspection system with experts testing the output of the process will help reduce the
information turnaround time. - (ANSWER)False: For a short information turnaround time, many
inspection points throughout the process are needed.



Which of the following does not belong to seven sources of waste? - (ANSWER)Overtime: Overtime is
not part of the seven sources of waste



What happens to the number of Kanban cards in the process if the replenishment time goes up? -
(ANSWER)The number of kanban cards increases



If takt time increases, the operation requires: - (ANSWER)fewer workers



What is the relationship between the number of kanban cards in a process and the inventory level? -
(ANSWER)There never can be more inventory in the process than what was authorized via Kanban cards.



Kaizen favors automation and investment in technology. - (ANSWER)False: Kaizen favors continuous
improvements driven by the employees.



Which of the following objectives is more important in a pull system? - (ANSWER)Producing at the rate
of demand

Escuela, estudio y materia

Institución
Operations Management
Grado
Operations Management

Información del documento

Subido en
2 de marzo de 2026
Número de páginas
3
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
SmarterCrest

Conoce al vendedor

Seller avatar
SmarterCrest Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1319
Miembro desde
2 meses
Número de seguidores
0
Documentos
602
Última venta
4 semanas hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes