Construction Management Final Questions With Complete Solutions
The following are the challenges facing the construction industry today, except - (ANSWER)decreasing
demand in sustainability requirements
the parameters define the overall extent of work to be included in a construction contract. -
(ANSWER)scope of project
a supplemental drawing to the plans and specifications that details fabrication method, materials, and
models of a product or installation associated with the project. - (ANSWER)shop drawings
it is a process of awarding a contract to subcontractors and issuing a purchase order for materials and
equipment. - (ANSWER)buy out
a request made by the owner to add or subtract features to the scope of the project resulting in changes
to the contract - (ANSWER)change order
a daily amount of money paid by the contractor to the owner for each day that the project fails to meet
the completion date specified in the contract - (ANSWER)liquidated damage
a change or addition to the contract documents issued after the documents have been released but
before the bids are due - (ANSWER)addenda
a contract document set consists of - (ANSWER)an agreement, construction drawings, specifications,
addenda, general and supplementary condition
the shop drawings are prepared by the - (ANSWER)architect
in the traditional project delivery method for buildings, the day-to-day supervision of the construction is
generally the responsibility of the - (ANSWER)general contractor
what is the first known recorded building code that outlines the roles and duties of the master builder -
(ANSWER)code of hammurabi
, Construction Management Final Questions With Complete Solutions
in the construction management (CM) method of project delivery, there is normally no general
contractor - (ANSWER)true
in the construction management at risk (CMAR) method of project delivery, the construction manager -
(ANSWER)manages the project's construction during the construction phase
what project delivery method in which only one firm is contracted for both design and construction of
the project - (ANSWER)design-build
what delivery method is best used if highly technical in nature of the project that requires good
communication and coordination need to occur between designers and builder? - (ANSWER)Design-
build
what delivery method in which there is no or limited input from contractors and subcontractors during
the design phase? - (ANSWER)Design-Bid-Build
Turnkey method is a variation of what delivery method when it also involves arranging for land and
financing of the project? - (ANSWER)Design-Build
what delivery method in which it is hard to get real up-front fixed price, or price may not be known until
it is actually built? - (ANSWER)design-build
what delivery method in which the owner assumes full responsibility on all liability risk during
construction stage? - (ANSWER)CM
the Master Format has been developed by the: - (ANSWER)Construction Specifications Institute
The UNIFORMAT II has been developed by the: - (ANSWER)American Society for Testing and Materials
the current master format consists of how many divisions - (ANSWER)50
The following are the challenges facing the construction industry today, except - (ANSWER)decreasing
demand in sustainability requirements
the parameters define the overall extent of work to be included in a construction contract. -
(ANSWER)scope of project
a supplemental drawing to the plans and specifications that details fabrication method, materials, and
models of a product or installation associated with the project. - (ANSWER)shop drawings
it is a process of awarding a contract to subcontractors and issuing a purchase order for materials and
equipment. - (ANSWER)buy out
a request made by the owner to add or subtract features to the scope of the project resulting in changes
to the contract - (ANSWER)change order
a daily amount of money paid by the contractor to the owner for each day that the project fails to meet
the completion date specified in the contract - (ANSWER)liquidated damage
a change or addition to the contract documents issued after the documents have been released but
before the bids are due - (ANSWER)addenda
a contract document set consists of - (ANSWER)an agreement, construction drawings, specifications,
addenda, general and supplementary condition
the shop drawings are prepared by the - (ANSWER)architect
in the traditional project delivery method for buildings, the day-to-day supervision of the construction is
generally the responsibility of the - (ANSWER)general contractor
what is the first known recorded building code that outlines the roles and duties of the master builder -
(ANSWER)code of hammurabi
, Construction Management Final Questions With Complete Solutions
in the construction management (CM) method of project delivery, there is normally no general
contractor - (ANSWER)true
in the construction management at risk (CMAR) method of project delivery, the construction manager -
(ANSWER)manages the project's construction during the construction phase
what project delivery method in which only one firm is contracted for both design and construction of
the project - (ANSWER)design-build
what delivery method is best used if highly technical in nature of the project that requires good
communication and coordination need to occur between designers and builder? - (ANSWER)Design-
build
what delivery method in which there is no or limited input from contractors and subcontractors during
the design phase? - (ANSWER)Design-Bid-Build
Turnkey method is a variation of what delivery method when it also involves arranging for land and
financing of the project? - (ANSWER)Design-Build
what delivery method in which it is hard to get real up-front fixed price, or price may not be known until
it is actually built? - (ANSWER)design-build
what delivery method in which the owner assumes full responsibility on all liability risk during
construction stage? - (ANSWER)CM
the Master Format has been developed by the: - (ANSWER)Construction Specifications Institute
The UNIFORMAT II has been developed by the: - (ANSWER)American Society for Testing and Materials
the current master format consists of how many divisions - (ANSWER)50