CM Final Questions With Complete Solutions

"Standardize" is one of the 5 S's. Correct Answers T

A BIM design begins with intelligent objects such as walls, roof,
and windows Correct Answers True

A BIM model cannot perform clash detection before the project
goes to the field Correct Answers False

A BIM model is a 3D representation of the physical and
functional characteristics of a building Correct Answers True

A change of process should trigger a training Correct Answers
true

A change order adjustment amount does not include general
overhead and profit. Correct Answers F

A claim can only be made after the project is complete. Correct
Answers F

A comprehensive quality control plan is the best way to control
quality during construction Correct Answers True

A good win-win example is using recycled concrete as a base
material for new roadways or driveways. Correct Answers True

A job hazard analysis focuses on jobs and tasks Correct Answers
True

,A LEAN program generates value. Correct Answers T

A LEAN program, once initiated, is good for many years
without improvement. Correct Answers F

A preparatory inspection is unnecessary to avoid miscues and
rework Correct Answers False

A project may go forward without paperwork Correct Answers
false

A public project has less governmental involvement than a
private project Correct Answers

A tailgate meeting to review safety procedures is a risk
management Correct Answers True

A zero-punch list should not be a goal of the project. Correct
Answers F

Adding contingencies may be a pre-bid method to offset a risk.
Correct Answers True

Additional time should always be asked for when processing a
change order Correct Answers True

After quality, safety is the number-one priority when managing
construction operations. Correct Answers False

AHJ does not include permits and inspections. Correct Answers
F

, AHJ stands for local Authorities Having Jurisdiction. Correct
Answers T

All BIM does is add a 3D component to 2D plans and specs.
Correct Answers False

An inspection is a check used when tracking quality. Correct
Answers True

An objective of sustainability is to reduce consumption of
nonrenewable resources, to minimize waste, and to create better
environments. Correct Answers true

An OSHA visit may be caused by an employee complaint.
Correct Answers true

An overcrowded worksite does not affect productivity Correct
Answers False

Application for payments is made on an AIA G702 form.
Correct Answers T

Arbitration can be more expensive than litigation. Correct
Answers true

Archeological findings are not a risk of the contractor Correct
Answers False

As-built drawings are part of contract close-out. Correct
Answers T

Información del documento

Subido en
1 de marzo de 2026
Número de páginas
20
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Classroom
4.0
(1212)
Vendido
5007
Seguidores
3246
Artículos
56710
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes