Examen

NYC Site Safety Manager (SSM) TEST Exam Latest Version 2026/2027| Questions and Correct Answers (Verified, exams

Document preview thumbnail
Vista previa 3 fuera de 17 páginas

NYC Site Safety Manager (SSM) TEST Exam Latest Version 2026/2027| Questions and Correct Answers (Verified, exams What is the definition of soil and foundation work? Grading in soil or installing underpinning, Augering in soil or removing sheeting, Excavating and drilling in soil or rock

Vista previa del contenido

NYC SITE SAFETY MANAGER (SSM) TEST EXAM LATEST
02/25/2026
VERSION 2026/2027| QUESTIONS AND CORRECT ANSWERS




NYC Site Safety Manager (SSM) TEST Exam Latest Version
2026/2027| Questions and Correct Answers (Verified, exams

What is the definition of soil and foundation work?

Grading in soil or installing underpinning, Augering in soil or removing sheeting, Excavating and
drilling in soil or rock




When contractors use light duty two-point adjustable suspended scaffolds in NYC, what

¾'' grade #1 unspliced manila rope




At what grade must power buggy brakes be capable of being fixed in engagement to hold a full load
stationary?

25% grade




The definition of _____________ is: a horizontal transverse scaffold member (which may be supported
by legs or runners) upon which the scaffold platform rests and joins scaffold uprights, posts, poles, and
similar members

Bearer (putlog)




The deck and the substantial enclosure of a sidewalk shed shall be extended parallel to the curb at least
20 feet beyond the building line when construction is_______

greater than 100 feet
2/25/2026




In structures undergoing demolition, how must the existing sprinkler system be maintained


1

, NYC SITE SAFETY MANAGER (SSM) TEST EXAM LATEST
02/25/2026
VERSION 2026/2027| QUESTIONS AND CORRECT ANSWERS



Non-automatic and Siamese hose connections shall be marked by a metal sign reading "Sprinkler
Siamese Connection" and by a red-light bulb at night




A ramp for a power buggy must be designed to support how many times the maximum intended live
load

4




The permanent floors of skeleton steel construction shall be installed as soon as possible as steel
installation progresses. In no case shall there be more than _________ or equivalent levels or
__________, whichever is less, between the erection floor and the uppermost permanent floor.

8 stories, 120 feet




If an open excavation has been discontinued or interrupted for at least ___ months, the lot shall be filled
and graded to eliminate all steep slopes, holes, obstructions, or similar sources of hazard.

3




Excavated material and superimposed loads such as equipment, trucks, etc., shall not be placed closer to
the edge of the excavation than a distance equal __________ the depth of such excavation, unless the
excavation is in rock or unless the sides of the excavation have been sloped or sheet piled (or sheeted)
and shored to withstand the lateral force imposed by such superimposed loads.

to one and one-half times




The Commissioner shall inquire into the cause of any accident involving equipment. When an accident
involves any piece of equipment on the site, no person shall do the following without the permission of
the Commissioner:
2/25/2026




Use such equipment or remove the equipment or any part thereof from the area of the job site


2

, NYC SITE SAFETY MANAGER (SSM) TEST EXAM LATEST
02/25/2026
VERSION 2026/2027| QUESTIONS AND CORRECT ANSWERS




According to 3314.8.2, the scaffold shall be enclosed with debris netting consisting of a wire screen
comprised of not less than _____ wire mesh, or equivalent synthetic with a maximum _________ mesh.

No. 18 steel, one-half inch




According to NYC DOB, how many years is the 32-Hour Rigging Supervisor Training valid for and how
many hours is the required refresher course?

4 years and 16 hours




Specific to foundation operations that affect adjacent properties: The owner of the property that may
be affected shall be given ____ days written notice of the intention to perform such operations.

10




According to Chapter 3301, any construction equipment that would affect public safety must be
inspected before use with the exception of

Hand tools




Who shall inspect construction equipment that might affect public safety before it is used for a specific
job at the construction site?

Competent person designated by the contractor




What are the four main suspended scaffolds inspections mandated by the NYC Building Code (Chapter
2/25/2026




33 Section 3314-scaffolds)?

Prior to installation, installation inspection, pre-shift, and after repair or adjustment.

3

Información del documento

Subido en
25 de febrero de 2026
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$17.00

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
141
Seguidores
18
Artículos
1852
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes