• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 25 páginas
Examen

CATEGORY 3 NON-CAB OPERATED CRANE SAFETY OA Comprehensive Resource To Help You Ace Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!!

Document preview thumbnail
Vista previa 3 fuera de 25 páginas

CATEGORY 3 NON-CAB OPERATED CRANE SAFETY OA Comprehensive Resource To Help You Ace Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!! 1) How often should you lubricate wire ropes? - Correct Answer: Every 200 operational hours 2) Where do you position the climbing gear after erecting the 12th tower section? - Correct Answer: Lowered to bottom 3) How many safety turns must be left on the drum? - Correct Answer: 3 4) If lower wraps are not used, unwind rope and wind it back with ____% of max load for pretension. - Correct Answer: 10% 5) Max allowable wind speed for dismantling/erection - Correct Answer: 20 mph 6) What is the proper response to an uncontrolled movement - Correct Answer: Engaged the emergency stop button 7) Where should main disconnect be located? - Correct Answer: Mounted at or near the initial base of the crane 8) What is the weight of a cubic foot of steel? - Correct Answer: 490 pounds 9) What is the weight of a cubic foot of concrete? - Correct Answer: 150 pounds 10) What operations might be a risk to stability? - Correct Answer: Pulling loads at an angle 11) On high strength bolt connections, which of the following does not get greased? Bolt threads, nut threads, nut contact face, bolt contact face, bolt shank. - Correct Answer: Bolt shank 12) What is the importance of properly pre-stretching high strength bolt connections? - Correct Answer: It has a favorable effect on the fatigue strength 13) What markings are found on high strength nuts and bolts - Correct Answer: Strength rating & Manufacturers designation 14) How many degrees should the outrigger pad be from the jack? - Correct Answer: 90 degrees 15) What is the plumb tolerance for tower cranes - Correct Answer: 1:500 or 1" in 40'

Vista previa del contenido

CATEGORY 3 NON-CAB OPERATED CRANE SAFETY OA
Comprehensive Resource To Help You Ace 2026-2027
Includes Frequently Tested Questions With ELABORATED
100% Correct COMPLETE SOLUTIONS

Guaranteed Pass First Attempt!!

Current Update!!



1) How often should you lubricate wire ropes? - Correct Answer: Every 200
operational hours


2) Where do you position the climbing gear after erecting the 12th tower
section? - Correct Answer: Lowered to bottom



3) How many safety turns must be left on the drum? - Correct Answer: 3


4) If lower wraps are not used, unwind rope and wind it back with ____% of
max load for pretension. - Correct Answer: 10%



5) Max allowable wind speed for dismantling/erection - Correct Answer:
20 mph



6) What is the proper response to an uncontrolled movement - Correct
Answer: Engaged the emergency stop button

,7) Where should main disconnect be located? - Correct Answer: Mounted
at or near the initial base of the crane



8) What is the weight of a cubic foot of steel? - Correct Answer: 490
pounds



9) What is the weight of a cubic foot of concrete? - Correct Answer: 150
pounds



10) What operations might be a risk to stability? - Correct Answer:
Pulling loads at an angle


11) On high strength bolt connections, which of the following does not
get greased? Bolt threads, nut threads, nut contact face, bolt contact face,
bolt shank. - Correct Answer: Bolt shank


12) What is the importance of properly pre-stretching high strength bolt
connections? - Correct Answer: It has a favorable effect on the fatigue
strength



13) What markings are found on high strength nuts and bolts -
Correct Answer: Strength rating & Manufacturers designation



14) How many degrees should the outrigger pad be from the jack? -
Correct Answer: 90 degrees

, 15) What is the plumb tolerance for tower cranes - Correct Answer:
1:500 or 1" in 40'



16) What are components inspected for before erection? By whom? -
Correct Answer: Components shall be inspected for damage by a
designated person



17) Extinguisher requirements for tower crane - Correct Answer: 10
ABC



18) Design factor for load hoist ropes - Correct Answer: Not less than
5



19) Design factor luffing boom hoist ropes - Correct Answer: Not less
than 3.5



20) Slices in tracks should be.. - Correct Answer: Smooth



21) You can weld on suspended loads only when... - Correct Answer:
Insulated slings are used


22) The pitch diameter of the load block sheaves shall not be less than
____ times the nominal diameter of the rope used - Correct Answer: 18
times

Información del documento

Subido en
11 de febrero de 2026
Número de páginas
25
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EWLindy
3.8
(116)
Vendido
780
Seguidores
432
Artículos
8873
Última venta
5 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes