• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 78 páginas
Examen

WGU - C722 Project Management -LATEST update- QUESTIONS AND ANSWERS 100-

Document preview thumbnail
Vista previa 4 fuera de 78 páginas

WGU - C722 Project Management -LATEST update- QUESTIONS AND ANSWERS 100-

Vista previa del contenido

WGU - C722 Project Management {LATEST
2026 -2027 update} QUESTIONS AND
ANSWERS 100% CORRECT

Activities are connected to two types of deliverables: - correct answer Project


management - communications, planning, execution, etc.


Project specific to the desired end result of this project




8/80 rule - correct answer do not assign anything that takes less than eight hours so


we allow resources sufficient work to occupy them and we don't micromanage




Project management deliverables - correct answer the concrete items we need to


manage this project. They are usually generic to a business or methodology adopted by


a PM for use to manage the team and create sound communications.

,Project specific deliverables - correct answer project specific deliverables are


required tasks




Risk Appetite - correct answer is the degree of uncertainty an entity is willing to take


on in anticipation of a reward.




Risk Tolerance - correct answer is the degree, amount, or volume of risk that an


organization or individual will withstand.




Risk Threshold - correct answer refers to measurements along the level of


uncertainty or the level of impact at which a stakeholder may have a specific interest.


Below that risk threshold, the organization will accept the risk. Above that risk


threshold, the organization will not tolerate the risk (PMBOK, 2015).

,Risk Planning - correct answer is the process of reviewing every aspect of the project


to identify what risks may occur.




Three essential drivers that must be achieved to generate positive characteristics in


project teams - correct answer Cohesiveness, Trust, Motivation




The five stages Dr. Bruce Tuckman (1965) introduced of group development - correct


answer Forming, Storming, Norming, Performing, Adjorning




Forming - correct answer In this stage, team members may be meeting for the first


time. Often, no one really knows much about anyone else on the team. It may be


premature to refer to this group of individuals as a team. It is a time of introduction


and forming relationships and understanding from exchange of information.

, Storming - correct answer Team members are beginning to know about each other,


but they do not yet understand how to work together. Members may "jockey for


position" within the team. The dynamics of working together beyond any written


statement of "roles and responsibilities" are being established. Personalities surface,


showing the strengths, weaknesses, and personal needs of each individual on the


team. Integration into a team may come with some struggle and conflict.




Norming - correct answer Team members have "figured out" how they will interact


with each other. Working relationships are beginning to form. Trust and understanding


is beginning to form between team members. They are beginning to feel comfortable


working together and openly and willingly sharing information.




Performing - correct answer Team members are fully comfortable working together.


Trust has been developed. Working relationships have jelled. Work is being conducted


and project progress is occurring.

Información del documento

Subido en
10 de febrero de 2026
Número de páginas
78
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$19.42

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Academicsfocus
3.0
(1)
Vendido
6
Seguidores
0
Artículos
416
Última venta
4 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes