WGU C722 Project Management |PA |Pre- Assessment Exam|Accurate |Verified

Document preview thumbnail
Vista previa 4 fuera de 52 páginas

WGU C722 Project Management |PA |Pre- Assessment Exam|Accurate |Verified

Vista previa del contenido

WGU C722 Project Management |PA |Pre-
Assessment Exam


Correct

Incorrect




1 of 70

Term



21. Why is the execution phase so important?
A. It is where the majority of the risk assessment takes place B. It is
where the work of the project is carried out C. It is where the work
breakdown structure is finalized D. It is where the baseline schedule is
calculated



Give this one a try later!



A. Move tasks around to more
efficiently allocate project team
C. Management chooses which areas
members
to emphasize in the weighted model
D. Determine when new team
members should be on-boarded

, D. Always - risks may occur at any B. It is where the work of the
time project is carried out


Don't know?




2 of 70

Term


35. A construction project to build a 20-story office building, where
90% of the space is under contract to various clients before the project
begins would be which of the following? A. High complexity, high
uncertainty B. High complexity, low uncertainty C. Low complexity, high
uncertainty D. Low complexity, low uncertainty



Give this one a try later!



B. Requirements Traceability Matrix D. Corrective action




B. High complexity, low D. Always - risks may occur at any
uncertainty time


Don't know?




3 of 70

Term

,9. In what situation would a functional organizational structure be used
for a project?
A. The company has a strong PMO and dedicated project managers B.
The project work to be completed is primarily consulting for other
companies C. The company is committed to implementing PMI
standards D. The project work will be carried out all by team members
in the same department
Give this one a try later!



A. How would you rate each of your A. Some of the later work will change
team member's performance on a based on the outcomes from the
scale of 1-10? earlier work on the project




D. The project work will be
A. Developing an artificial
carried out all by team
intelligence tool to predict stock
members in the same
market performance
department


Don't know?

, 4 of 70

Term


36. Which of the following projects would be unlikely to use traditional
project management methods? A. Developing an artificial intelligence
tool to predict stock market performance B. Replacing crumbling
sidewalks and putting in a crosswalk near an elementary school C.
Transitioning payroll services to a new vendor with lower processing
costs D. Coordinating the local media advertising for a touring
Broadway show



Give this one a try later!



B. Project team members may be
C. Management chooses which areas
overwhelmed by operational tasks
to emphasize in the weighted model
and project work




A. Move tasks around to more
A. Developing an artificial efficiently allocate project team
intelligence tool to predict members
stock market performance D. Determine when new team
members should be on-boarded


Don't know?




5 of 70

Term

Información del documento

Subido en
3 de febrero de 2026
Número de páginas
52
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CLOUNDLite
3.9
(128)
Vendido
662
Seguidores
389
Artículos
12356
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes