ToyMax seeks to determine the number of Kanban containers needed to feed a newly established work
cell. The cell requires 600 parts over an eight-hour day. Production lead time for the parts needed by the
cell us 3 hours and the cell supervisor recommends a safety stock equal to 50% of the cell's daily
production. Assuming a container size of 100 parts, how many containers are needed for the new cell? -
(ANSWER)Demand = 600/8
Safety stock = 50% = 300
Container size = 100
Lead time = 3
K = (600/8*3+300)/100=5.25
Assume that you are engaged in a project that seeks to improve the flow of customers at a Tennessee
Department of Motor Vehicles location. For simplicity, assume that the facility has a single clerk on duty
at any point in time. The clerk serves an average of 12 customers per hour. Moreover, you know that, on
the average, there are 10 customers at that DMV location. Find the average time that a customer
spends in the DMV office. - (ANSWER)10/12=.83333 hrs = 50 min
Suppose a switch assembly is assembled in batches of 5 units from an upstream assembly area and
delivered in a special container to a downstream control-panel assembly operation. This control-panel
assembly area requires 7 switch assemblies per hour. The switch assembly area can produce a container
of switch assemblies in 90 min and safety stock has been set at 3 switch assemblies. This assembly
system operates with 5 Kanban cards. Is their current inventory policy efficient? What is the max
inventory of switch assemblies allowed in this system? - (ANSWER)demand = 7
safety stock = 3
container = 5
lead time = 90
K = (7*90/60+3)/5=2.7
5 containers * 5 assemblies = 25
The difference between the upper and lower control limits of an x-bar chart for a process is 10 units. The
quality engineer monitoring the process has been collecting samples of size 7 every hour for the past
several months. What is the implied average range from the results above? - (ANSWER)n = 7
A2 = .419
UCL = 10
ToyMax seeks to determine the number of Kanban containers needed to feed a newly established work
cell. The cell requires 600 parts over an eight-hour day. Production lead time for the parts needed by the
cell us 3 hours and the cell supervisor recommends a safety stock equal to 50% of the cell's daily
production. Assuming a container size of 100 parts, how many containers are needed for the new cell? -
(ANSWER)Demand = 600/8
Safety stock = 50% = 300
Container size = 100
Lead time = 3
K = (600/8*3+300)/100=5.25
Assume that you are engaged in a project that seeks to improve the flow of customers at a Tennessee
Department of Motor Vehicles location. For simplicity, assume that the facility has a single clerk on duty
at any point in time. The clerk serves an average of 12 customers per hour. Moreover, you know that, on
the average, there are 10 customers at that DMV location. Find the average time that a customer
spends in the DMV office. - (ANSWER)10/12=.83333 hrs = 50 min
Suppose a switch assembly is assembled in batches of 5 units from an upstream assembly area and
delivered in a special container to a downstream control-panel assembly operation. This control-panel
assembly area requires 7 switch assemblies per hour. The switch assembly area can produce a container
of switch assemblies in 90 min and safety stock has been set at 3 switch assemblies. This assembly
system operates with 5 Kanban cards. Is their current inventory policy efficient? What is the max
inventory of switch assemblies allowed in this system? - (ANSWER)demand = 7
safety stock = 3
container = 5
lead time = 90
K = (7*90/60+3)/5=2.7
5 containers * 5 assemblies = 25
The difference between the upper and lower control limits of an x-bar chart for a process is 10 units. The
quality engineer monitoring the process has been collecting samples of size 7 every hour for the past
several months. What is the implied average range from the results above? - (ANSWER)n = 7
A2 = .419
UCL = 10