Examen

OSC Exam 2 Questions With Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

OSC Exam 2 Questions With Complete Solutions

Vista previa del contenido

OSC Exam 2 Questions With Complete Solutions

______ represent(s) orders that have been placed but not yet
received or completed. Correct Answers Scheduled receipts

A components manufacturer uses approximately 20,000 units
annually of an item. They are used at a steady rate during the
250 workdays that the plant operates. The cost of each item is
$7.00, and the annual carrying cost is $0.50 per unit per year.
The ordering cost is $50. What is the economic order quantity?
Correct Answers 2,000 units

A components manufacturer uses approximately 20,000 units
annually of an item. They are used at a steady rate during the
250 workdays that the plant operates. The cost of each item is
$7.00, and the annual carrying cost is $0.50 per unit per year.
The ordering cost is $50. What is the time between orders using
the EOQ order quantity? Correct Answers 25 workdays

A network diagram is used to show what? Correct Answers
precedence relationships

A product has an average demand of 40 units per week and a
standard deviation of 10 units per week (normally distributed).
The lead time is 5 weeks. What is the safety stock inventory if
the organization wants to achieve a 90% cycle-service level?
Correct Answers 29 units

A product structure tree is often used to visually represent the
Correct Answers Bill of materials

, A technique that offers customers incentives to shape their
demand patterns refers to Correct Answers Yield management

Activity 7 is directly preceded by two activities, activity 5 and
activity 6. Activity 5 has an expected time of 5 and ES time of 6.
Activity 6 has an expected time of 7 and an ES time of 7.
Activity 7 has an expected time of 10. The ES for activity 7 is:
Correct Answers 14

An approach to reduce the amount of fluctuations in day-to-day
resource requirements within an organization is Correct
Answers resource leveling

An inventory review system that always orders the same
quantity of items but may have differing periods of time
between orders has what type of review system? Correct
Answers Continuous

An item that is manufactured from component parts is known as
Correct Answers A parent

Being an expert in information integration, project scope, time
management, quality management, human resources,
communications, risk and procurement are beneficial skills for
what member of a project management team?
-project accountant
-project planner
-project manager
-project auditor
-project sponsor Correct Answers Project manager

Información del documento

Subido en
1 de febrero de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Classroom
4.0
(1212)
Vendido
5007
Seguidores
3246
Artículos
56710
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes