Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

RTPM Study guide Questions With Correct Answers

Puntuación
-
Vendido
-
Páginas
102
Grado
A+
Subido en
29-01-2026
Escrito en
2025/2026

RTPM Study guide Questions With Correct Answers

Institución
RTPM
Grado
RTPM

Vista previa del contenido

RTPM Study guide Questions With
Correct Answers

Technology |Responsibility |Matrix

The |technology |responsibility |matrix |includes |key |information |about |furnishings, |the |
statement |of |work, |technology |systems, |and |technology |spaces. |It |does |not, |however, |include |
information |about |the |commissioning |or |QA |plans. |(TPMRM, |page |1-24)




Integration |Management

Covers |the |breakup |of |a |larger |project |to |multiple |small |projects |or |conversely |running |several
|small |projects |as |one |. |it |also |includes |the |integration |of |various |sub-contractors |into |the |


organization |under |an |integrated |plan.




Stakeholder |management |"Keep |satisified"

Client |President

Financial |sponsors

cheif |finance |officer

AHJ

general |contractor.




Stakeholder |management |"Manage |Closely"

Board |of |directors

,client |PM

general |contractor |PM




Stakenholder |management |"Monitor"

Architect

Engineer

Sub |contractors

Service |providers




Stakeholder |management |"Keep |Informed"

design |consultaint |(client)

Department |heads

Community |advocates

Client |staff

Vendors

End |user




OBS |"Orgnization |Breakdown |Structure"

Shows |who |is |responsible |for |other |team |members. |simular |to |a |RACI |chart |regardless |of |the |
pay |scale |or |hierarchy




Work |Breakdown |Structure |(WBS)

,It |must |cover |the |elements |of |the |project's |end |product |or |deliverable |and |also |all |the |
elements |of |the |project, |including:

1 |Planning

2 |Implementing |the |project

3 |Closing |out |the |project.

It |should |be |as |specific |as |possible.




Work |Breakdown |Structure |(WBS) |Level |1 |first |position

Represents |the |overall |deliverable |of |the |project.




Work |Breakdown |Structure |(WBS) |Second |position

Represents |summary |tasks |within |the |overall |deliverable |or |project.




Work |Breakdown |Structure |(WBS) |Third |position

Represents |work |packages |that |are |discrete |activities |within |each |summary |task |within |the |
overall |deliverable |of |a |project.




PERT |developing |a |schedule |finish |to |start

Finish |- |Start

Pulling |cable |can't |start |until |installing |conduit |finishes




PERT |developing |a |schedule |Finish |- |Finish

, finish |- |finish

Labeling |outlets |cannot |finish |until |testing |finishes




PERT |developing |a |schedule |Start |- |Start

Start |- |Start

Bond |basket |tray |cannot |start |until |hang |basket |tray |starts




PERT |developing |a |schedule |Start |- |Finish

Start |- |Finish

install |fiber |can |not |finish |until |ordered |fiber |starts




What |are |the |three |estimates |used |in |PERT |for |each |activity?

Optimistic,

Most |Likely,

Pessimistic




What |does |the |Optimistic |estimate |represent |in |PERT?

Lowest |projected |cost |or |fastest |time




What |does |the |Most |Likely |estimate |represent |in |PERT?

Average |project |cost |or |time

Escuela, estudio y materia

Institución
RTPM
Grado
RTPM

Información del documento

Subido en
29 de enero de 2026
Número de páginas
102
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$21.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectphilip West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
213
Miembro desde
1 año
Número de seguidores
6
Documentos
21462
Última venta
17 horas hace
WELCOME TO LECTPHILIP, A PLACE WHERE WE UNLOCK YOUR ACADEMIC OPPORTUNITIES

On this page, you find all documents, package deals and flashcards offered by seller lectphilip

3.9

38 reseñas

5
17
4
8
3
9
2
2
1
2

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes