• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

CEPSCI || 100% Verified Solutions.

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

CEPSCI || 100% Verified Solutions.

Vista previa del contenido

CEPSCI || 100% Verified Solutions.
NPDES correct answers National Pollutant Discharge Elimination System

Clean Water Act correct answers Administered by the EPA in 1972

Water Quality Act correct answers Amendment to CWA in 1987 to regulate storm water
discharges under NPDES program

Point Source Pollution correct answers Discharges from readily identifiable sources like
treatment plants

Nonpoint Source Solution correct answers Runoff from urbanized or agricultural areas

NPDES in South Carolina correct answers SC is a delegated state. Regulations are administered
by SCDHEC

CGP Phase II correct answers Construction General Permit effective on September 1, 2006

NPDES Permit Coverage correct answers 1 or more acres of land disturbance. Within 1/2 mile of
a receiving water body in SC Coastal Zone

NOI correct answers Notice Of Intent

CGP Requirements for OCRM correct answers Coverage granted 7 days after DHEC receives
NOI

CGP Requirements for SCDOT correct answers Coverage granted 10 days after DHEC receives
NOI

CGP Requirements for DHEC correct answers Coverage granted 20 days after DHEC receives
completed NOI

SWPPP correct answers Storm Water Pollution Prevention Plan, Completed prior to filing NOI,
Prepared in accordance with Phase II CGP

SWPPP Requirements correct answers Identification of operators
Sequence of construction
Locations of all BMP's
Locations of all surface waters of state

CGP Filing correct answers Must be in compliance with all other permits
Must comply with Federal reporting requirements
File NOT when construction is complete
Retain documentation 3 years.

, Pre Construction meeting correct answers 10 or more acres
Explain SWPPP to all co-permittees
Contractors that are not co-permittees and the preparer must be present

Contractor Certification correct answers Co-permittees certify that are responsible for control of
the SWPPP and have participated in a Pre-Con meeting
All Contractors that are not co-permittees must certify accountability to DHEC and a Pre-Con
meeting

EPSC Inspector Qualifications correct answers Individuals certified by a DHEC approved
course.

Inspection Frequency correct answers (A) At least once every 7 days, or
(B) At least once every 14 days and within 24 hours of the end of a storm event of 0.5 inches or
greater
(C) Once a month if entire site is temporarily stabilized

Inspection Locations correct answers All areas disturbed by construction activities
Areas used for materials storage exposed to precipitation
Sediment/Erosion control structures in SWPPP
All discharge locations
Nearby downstream locations
Constuction entrances

Inspection Report correct answers 1. Date
2. Inspector credentials
3. Weather info since last report
4. Description of any discharges occuring
5. locations of discharges of sediment or pollutants
6. Location of BMPs that need maintenance
7. Location of BMPs that have failed
8. Location of additional BMPs needed
9. Corrective actions required

Notice Of Termination correct answers Can be submitted if one of the following conditions have
been met:
1. Final stabilization has been achieved on all portions of site
2. Another operator has assumed control
3. Residential temporary stabilization in place and deed has been transferred to new owner

Stop Work Order correct answers Can be issued if:
Off site sedimentation resulting from non compliance
Work is being conducted without an approved SWPPP

Potential Enforcement Actions correct answers Civil penalty of $1000 a day of violation
Violation of SC Pollution Control Act:

Información del documento

Subido en
25 de enero de 2026
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.59

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SirAnton
3.7
(118)
Vendido
807
Seguidores
438
Artículos
40068
Última venta
3 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes