Most electrical line work falls into what three categories? correct answers -Construction
-Maintenance
-Utilities
Construction refers to what type of work? correct answers Building new
-Facilities
-Transmission Lines
-Extending distribution lines
-Installing underground
Maintenance refers to what type of work? correct answers Work preformed on existing lines or
equipment
-Replacing conductors
-Changing out aging poles/ structural members
-Replacing regulators, capacitors, reclosers, etc
Repair refers to what type of work? correct answers Different from maintenance because it
typically involves an emergency situation.
-Restoring power
-Repairing storm damage
-Fixing poles
-Repairing broken conductors or structures that require immediate attention
Who distinguishes where a task lands in these three categories? correct answers The
Occupational Safety and Health Administration (OSHA)
What are the two categories that linework is governed by? correct answers -Construction
-General industry (both maintenance and repair)
What are the two methods of working on line? correct answers -Energized
-De-energized
Energized work is preformed when the line is _____________. correct answers "Hot"
What are the common work processes for working energized line? correct answers -Hot stick
-Rubber gloving (including use of rubber sleeves)
-Barehanding
De-energized work involves protection against both ____________ and ________ sources of
electric energy. correct answers -Normal
-Abnormal
What are the three steps that must be taken before equipment is de-energized? correct answers -
Disconnect
, -Test
-Properly ground
How do we properly disconnect lines? correct answers All connections have been opened,
locked, and tagged from all normal sources of energy.
How do we properly test lines? correct answers This must occur before any grounding
components are connected. If the test indicates that the lines are still hot, STOP! Notify the crew
leader.
How do we properly ground lines? correct answers Ground the supply conductors (phase).
Grounding provides a low-resistance path to the best available ground in case the line or
equipment become energized.
What factors go into deciding whether to work energized or de-energized? correct answers -
Employee safety
-Utility demands
-Customer expectations
-Construction standerds
-Equipment availability
-Weather conditions
-Qualifications of personnel
What are the two grounding procedures? correct answers -Equipotential zone (EPZ) grounding.
The preferred method for protecting the lineworker.
-Bracket grounding is used to trip out the circuit as quickly as possible.
What does bonding refer to? correct answers Connecting any conductive item within the work
space to the same potential as the grounded phase.
True or False current will only take the path of least resistance? correct answers False. Current
will divide and take every available path to objects of different potential.
What is the only way to completely prevent current flow through the lineworker. correct answers
-Insulate
-Isolate
Protective grounding and bonding are effective if they meet what two objectives? correct
answers -Minimize the time it takes to trip the circuit
-Limit the current flow and voltage drop across the lineworkers body.
What are the three principles to manage current while working energized lines? correct answers -
Insulate (use hot sticks, rubber gloves/sleeves, and rubber/plastic cover up)
-Isolate (create physical separation from any object of different potential)
-Protect against second point of contact (arrange the insulation and isolate the workers and tools
so that anything with a difference of potential does not reach the worker)
Most electrical line work falls into what three categories? correct answers -Construction
-Maintenance
-Utilities
Construction refers to what type of work? correct answers Building new
-Facilities
-Transmission Lines
-Extending distribution lines
-Installing underground
Maintenance refers to what type of work? correct answers Work preformed on existing lines or
equipment
-Replacing conductors
-Changing out aging poles/ structural members
-Replacing regulators, capacitors, reclosers, etc
Repair refers to what type of work? correct answers Different from maintenance because it
typically involves an emergency situation.
-Restoring power
-Repairing storm damage
-Fixing poles
-Repairing broken conductors or structures that require immediate attention
Who distinguishes where a task lands in these three categories? correct answers The
Occupational Safety and Health Administration (OSHA)
What are the two categories that linework is governed by? correct answers -Construction
-General industry (both maintenance and repair)
What are the two methods of working on line? correct answers -Energized
-De-energized
Energized work is preformed when the line is _____________. correct answers "Hot"
What are the common work processes for working energized line? correct answers -Hot stick
-Rubber gloving (including use of rubber sleeves)
-Barehanding
De-energized work involves protection against both ____________ and ________ sources of
electric energy. correct answers -Normal
-Abnormal
What are the three steps that must be taken before equipment is de-energized? correct answers -
Disconnect
, -Test
-Properly ground
How do we properly disconnect lines? correct answers All connections have been opened,
locked, and tagged from all normal sources of energy.
How do we properly test lines? correct answers This must occur before any grounding
components are connected. If the test indicates that the lines are still hot, STOP! Notify the crew
leader.
How do we properly ground lines? correct answers Ground the supply conductors (phase).
Grounding provides a low-resistance path to the best available ground in case the line or
equipment become energized.
What factors go into deciding whether to work energized or de-energized? correct answers -
Employee safety
-Utility demands
-Customer expectations
-Construction standerds
-Equipment availability
-Weather conditions
-Qualifications of personnel
What are the two grounding procedures? correct answers -Equipotential zone (EPZ) grounding.
The preferred method for protecting the lineworker.
-Bracket grounding is used to trip out the circuit as quickly as possible.
What does bonding refer to? correct answers Connecting any conductive item within the work
space to the same potential as the grounded phase.
True or False current will only take the path of least resistance? correct answers False. Current
will divide and take every available path to objects of different potential.
What is the only way to completely prevent current flow through the lineworker. correct answers
-Insulate
-Isolate
Protective grounding and bonding are effective if they meet what two objectives? correct
answers -Minimize the time it takes to trip the circuit
-Limit the current flow and voltage drop across the lineworkers body.
What are the three principles to manage current while working energized lines? correct answers -
Insulate (use hot sticks, rubber gloves/sleeves, and rubber/plastic cover up)
-Isolate (create physical separation from any object of different potential)
-Protect against second point of contact (arrange the insulation and isolate the workers and tools
so that anything with a difference of potential does not reach the worker)