When working on De-energize lines and equipment the focus is on protecting... correct answers
Workers in case the line becomes energized unexpectedly
Per OSHA what must every job begin with correct answers A briefing or Tailboard
Installing protective grounds and bonds are designed to correct answers Minimize the time it
takes to trip the circuit and limit the current flow and voltage drop across the line workers body
The steps to properly ground a line apply to overhead and underground circuits include correct
answers Identify, disconnect, test, clean, and ground
Per OSHA you must test all lines and equipment before doing what? correct answers Applying
grounds
When testing line for voltage act as if it is correct answers Energized
What are the common tools use for testing the line for voltage correct answers Multirange
voltage detector and audible tester
True or false? You should test the tester, then test the line for voltage and then test the tester
wants more correct answers True
What method should you not use for testing the conductor for voltage? correct answers Buzz
Testing
What is the purpose of installing protective grounds on a conductor? correct answers To create a
low resistance path for current to flow
The best grounding stores depends on your correct answers Location and what is being cleared
Types of grounding correct answers Substation ground grid, system neutral, temporary
grounding rod (TGR), static shielding wire, and anchor rods
What grounding source runs the entire length of the circuit? correct answers System Neutral
Should be grounded at least four times per mile. correct answers System neutral
The deeper it is placed, the less resistance it has. correct answers Temporary Ground Rod (TGR)
What risk is encountered when installing TGR? correct answers Underground utilities
In order of preference ground sources for overhead distribution. correct answers Substation
ground grid
System neutral
When working on De-energize lines and equipment the focus is on protecting... correct answers
Workers in case the line becomes energized unexpectedly
Per OSHA what must every job begin with correct answers A briefing or Tailboard
Installing protective grounds and bonds are designed to correct answers Minimize the time it
takes to trip the circuit and limit the current flow and voltage drop across the line workers body
The steps to properly ground a line apply to overhead and underground circuits include correct
answers Identify, disconnect, test, clean, and ground
Per OSHA you must test all lines and equipment before doing what? correct answers Applying
grounds
When testing line for voltage act as if it is correct answers Energized
What are the common tools use for testing the line for voltage correct answers Multirange
voltage detector and audible tester
True or false? You should test the tester, then test the line for voltage and then test the tester
wants more correct answers True
What method should you not use for testing the conductor for voltage? correct answers Buzz
Testing
What is the purpose of installing protective grounds on a conductor? correct answers To create a
low resistance path for current to flow
The best grounding stores depends on your correct answers Location and what is being cleared
Types of grounding correct answers Substation ground grid, system neutral, temporary
grounding rod (TGR), static shielding wire, and anchor rods
What grounding source runs the entire length of the circuit? correct answers System Neutral
Should be grounded at least four times per mile. correct answers System neutral
The deeper it is placed, the less resistance it has. correct answers Temporary Ground Rod (TGR)
What risk is encountered when installing TGR? correct answers Underground utilities
In order of preference ground sources for overhead distribution. correct answers Substation
ground grid
System neutral