• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 45 páginas
Examen

C722 Project Management (highlighted study guide + JO's tips + practice test)

Document preview thumbnail
Vista previa 4 fuera de 45 páginas

C722 Project Management (highlighted study guide + JO's tips + practice test) C722 Project Management (highlighted study guide + JO's tips + practice test) C722 Project Management (highlighted study guide + JO's tips + practice test) C722 Project Management (highlighted study guide + JO's tips + practice test)

Vista previa del contenido

C722 Project Management (highlighted study guide + JO's tips + practice
test)
Study online at https://quizlet.com/_dkn5e2

1. Project A temporary activity that creates a unique result.
Initiatives with specific goals and start and end dates. Devel-
op a new product or service, reduce costs, add technology,
etc.

Examples:
A car company developing a new passenger car.
A freight company adding a computer program to optimize
cargo carrying capacity.
A construction company building a new facility for a cus-
tomer.

2. Project Life Cycle Phases Defining, Planning, Executing, Closing

3. Defining phase Idea for the project is generated and formalized into a pro-
ject proposal and the decision on whether the project will be
selected for implementation is made

4. Planning phase Where detailed planning occurs. Level of detail aligns with
complexity of project. Use Work Breakdown Structure to
identify outcomes needed.

Can require significant time for large projects.

Typically ends when baselines for scope, budget, and sched-
ule are approved by customer and/or sponsor and project
team.

5. Executing phase Where most of the work is done.

Deliverables are completed. Progress is monitored and ac-
tions taken as needed to stay on track.



, C722 Project Management (highlighted study guide + JO's tips + practice
test)
Study online at https://quizlet.com/_dkn5e2


May return to planning phase as needed if objectives can't
be met, to modify budget, schedule, or scope.

Critical to be careful of scope creep - don't add functionality
without considering impact.

This phase is complete when all work activities and deliver-
ables are ready to be delivered to customer/sponsor.

6. Closing phase When project outcomes are delivered to the customer
and/or sponsor.

Project Manager ties up loose ends:
- Reassign project resources back to company
- Document project results and lessons learned
- Close out procurement activities
- Verify completed project is transitioned to customer

7. Triple Constraints of Project Describes the required balance of time, cost, and scope for
Management a project.

8. Change Control Board (CCB) Those with authority to approve changes.

Ensures change doesn't negatively impact the project's triple
constraint of time, cost, and scope.

Can be a small group of individuals from within a project
team.

9. PMBOK Project Management Body of Knowledge

10.


, C722 Project Management (highlighted study guide + JO's tips + practice
test)
Study online at https://quizlet.com/_dkn5e2
Functional/Departmentalized Oldest & most basic form.
Org
PROS
Clear lines of authority.
SMEs can work on multiple projects.
Flexible use of staff within unit.
Easy to prioritize dept work within unit.Clear paths for career
growth.

CONS
Low project manager authority.
Ineffective for projects.
Org doesn't focus on solving business-wide issues.
Sharing resources across functions can be difficult.
Project customer not only focus; customer response can be
slow.
Can lead to information silos.

11. Matrix Org The principal differentiation between a matrix structure and
either a functional or a projectized structure is that a matrix
has less clearly defined lines of reporting.

PROS
Project is central focus
PMs have access to lots of technically skilled people, SMEs as
needed
Team members have less anxiety about futures
Customer response is fast
No duplication in admin personnel
Team organization is flexible

CONS


, C722 Project Management (highlighted study guide + JO's tips + practice
test)
Study online at https://quizlet.com/_dkn5e2
Requires cooperation, coordination among managers
SMEs not in daily contact with other SMEs to share knowl-
edge
Decision making authority not always clear
Resource balancing is simpler, but can lead to friction
Closeouts can be difficult
Division of authority is complex

12. Strong Matrix Organization There are attempts to provide the appearance of project
teams in the matrix organization.

The project manager has much more control over various
project aspects than in other organizational forms, includ-
ing:
*Scope, including trade-offs
*Schedule
*Budget
*Assignments of functional personnel

13. Balanced Matrix Organization Recognizes the need for a project manager, it does not
provide the project manager with the full authority over the
project and project funding

The project manager defines what needs to be accomplished
and establishes the overall:
plan,
schedule,
budget,
etc.

The functional manager determines how the project will be
accomplished. The functional manager:

Información del documento

Subido en
14 de enero de 2026
Número de páginas
45
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BESTGRADE32
3.3
(7)
Vendido
55
Seguidores
2
Artículos
4863
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes