Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 26 páginas
Examen

WGU C207 OA Practice Questions 2026 | Data-Driven Decision Making Study Guide

Document preview thumbnail
Vista previa 3 fuera de 26 páginas

Prepare for WGU C207 OA (Objective Assessment) with a comprehensive 2026 study guide featuring high-yield practice questions and detailed explanations. Focus on data analysis, predictive and prescriptive analytics, Excel functions, and decision-making frameworks. Learn to interpret business data, apply quantitative methods, and make data-driven recommendations for organizational decisions. Ideal for WGU students seeking confidence and success on the C207 Objective Assessment.

Vista previa del contenido

1|Page


WGU C207 OA – Practice Question (NEW UPDATED VERSION) LATEST ACTUAL
EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED QUESTIONS AND
ANSWERS)- GUARANTEED PASS A+ UPDATED 2026



1. A factory has an average demand of 400 units/week. Ordering cost = $40, holding cost =
$2/unit. EOQ = ?
A. 200
B. 282
C. 400
D. 447
Answer: B (282 units)
Rationale: EOQ = √(2DS/H) → √(2×400×40/2) = √16000 ≈ 126.5 → Wait, calculate carefully:
√(240040/2) = √(16000) = 126.5 Actually 127 units. Correct Answer = 127.
Updated Answer: 127 units.



2. In a flowchart, a triangle symbol represents:
A. Inspection
B. Delay
C. Storage
D. Operation
Answer: B (Delay)
Rationale: Standard symbols: triangle = delay, rectangle = operation, diamond = decision.



3. Project task B depends on task A (duration 5 days). Task C depends on B (duration 3
days). Earliest finish for C?
A. 5 days
B. 3 days
C. 8 days
D. 10 days
Answer: C (8 days)
Rationale: Task durations accumulate along dependencies: 5 + 3 = 8 days.



4. A company uses JIT inventory. Likely effect?
A. Increased lead times
B. Reduced inventory costs
C. Higher waste


2026 2027 GRADED A+

,2|Page


D. Overproduction
Answer: B (Reduced inventory costs)
Rationale: JIT minimizes inventory and reduces holding costs.



5. A Pareto chart shows the most frequent defects. The top 20% causes produce 80% of
defects. This demonstrates:
A. 50/50 rule
B. 80/20 principle
C. Process variability
D. Lean principle
Answer: B (80/20 principle)
Rationale: Pareto charts visualize the 80/20 rule to focus improvement efforts.



6. In a Gantt chart, a bar represents:
A. Task duration
B. Cost
C. Inventory
D. Quality inspection
Answer: A (Task duration)
Rationale: Gantt charts display tasks along a timeline.



7. Inventory peaks at 500 units, safety stock 100 units. Reorder point = ?
A. 200
B. 100
C. 300
D. 50
Answer: B (100 units)
Rationale: Reorder point = safety stock + expected demand during lead time.



8. Forecasted demand = 1000, actual = 900 → forecast error = ?
A. +100
B. –100
C. 0
D. 900
Answer: B (–100)
Rationale: Error = Forecast – Actual = 1000 – 900 = 100 → check negative: Forecast – Actual =
100 → Positive 100 Corrected: +100.



2026 2027 GRADED A+

, 3|Page




9. Process capability index (Cpk) = 1.2 → meaning?
A. Process incapable
B. Meets specifications
C. High variability
D. Process unstable
Answer: B (Meets specifications)
Rationale: Cpk >1 indicates process is capable and within limits.



10. EOQ problem: Weekly demand = 600, ordering cost = $30, holding cost = $5/unit. EOQ
=?
A. 60
B. 120
C. 269
D. 300
Answer: C (269 units)
Rationale: EOQ = √(2DS/H) → √(2×600×30/5)=√7200≈84.85 → Wait recalc: 260030=36,000
/5=7,200 → √7200 ≈ 84.85 Correct Answer: 85 units.



11. A process has a bottleneck at workstation 2. Solution?
A. Reduce capacity at station 2
B. Increase capacity at station 2
C. Remove station 1
D. Skip inspections
Answer: B (Increase capacity)
Rationale: Bottleneck limits throughput; increasing its capacity improves output.



12. A process flow diagram uses a rectangle → represents:
A. Storage
B. Operation
C. Inspection
D. Delay
Answer: B (Operation)
Rationale: Rectangles indicate tasks/operations.



13. Lead time demand = 150 units, safety stock = 50 → reorder point = ?
A. 150


2026 2027 GRADED A+

Información del documento

Subido en
13 de enero de 2026
Número de páginas
26
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$28.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CornelWest
3.7
(260)
Vendido
1628
Seguidores
1128
Artículos
12876
Última venta
5 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes