BECC MOD 2 2026 EXAM PREP SCRIPT FULL
QUESTION SET APPROVED
◉ How long are operational logs maintained for? Answer: 6 months
◉ what is the record where all speed changes for each individual
shaft are recorded? Answer: bell book
◉ what log is maintained in dc central Answer: damage control
closure log
◉ What log records day to day events in the engineering plant
Answer: the engineering log
◉ responsible for physical security of the main reduction gear?
Answer: engineer officer
◉ watch fire and flooding get reported to Answer: sounding and
security watch
◉ in port watch in charge of physical security of the ship and takes
control of security forces Answer: CDO
,◉ What program is used to safeguard the ship from sabotage?
Answer: physical security program
◉ What device is a positive stop used to prevent inadvertent
manipulation? Answer: a locking device
◉ the use of EOSS is Answer: mandatory
◉ What are the 3 parts of an EOSS? Answer: the EOSS users guide,
EOP, EOCC
◉ What 2 actions of the EOCC that must be memorized Answer:
controlling and immediate actions
◉ 4 actions EOCC Answer: controlling, immediate, supplementary,
restore casualty
◉ used to alert personnel to an action that if not strictly adhered to
may result in injury to personnel Answer: warning
◉ who uses master plant procedures Answer: EOOW, OOD, SPACE
SUPERVISOR
, ◉ table that displays proper valve alignment for various tanks
Answer: tank tables
◉ What part of EOP provides tank capacities Answer: tank status
diagram
◉ What document provides standardized procedures tailored to
each ship Answer: EOSS
◉ What chart helps keep track of what equipment is on line Answer:
status chart
◉ why is oil in bilges considered hazardous Answer: generate
vapors that can ignite with a spark or open flame
◉ parts per million of oily waste that is sufficient to cause a sheen
Answer: 15-20
◉ Mark 2 spill kit location Answer: main deck
◉ complete discontinuation of all discharges of oily waste Answer:
OPA
QUESTION SET APPROVED
◉ How long are operational logs maintained for? Answer: 6 months
◉ what is the record where all speed changes for each individual
shaft are recorded? Answer: bell book
◉ what log is maintained in dc central Answer: damage control
closure log
◉ What log records day to day events in the engineering plant
Answer: the engineering log
◉ responsible for physical security of the main reduction gear?
Answer: engineer officer
◉ watch fire and flooding get reported to Answer: sounding and
security watch
◉ in port watch in charge of physical security of the ship and takes
control of security forces Answer: CDO
,◉ What program is used to safeguard the ship from sabotage?
Answer: physical security program
◉ What device is a positive stop used to prevent inadvertent
manipulation? Answer: a locking device
◉ the use of EOSS is Answer: mandatory
◉ What are the 3 parts of an EOSS? Answer: the EOSS users guide,
EOP, EOCC
◉ What 2 actions of the EOCC that must be memorized Answer:
controlling and immediate actions
◉ 4 actions EOCC Answer: controlling, immediate, supplementary,
restore casualty
◉ used to alert personnel to an action that if not strictly adhered to
may result in injury to personnel Answer: warning
◉ who uses master plant procedures Answer: EOOW, OOD, SPACE
SUPERVISOR
, ◉ table that displays proper valve alignment for various tanks
Answer: tank tables
◉ What part of EOP provides tank capacities Answer: tank status
diagram
◉ What document provides standardized procedures tailored to
each ship Answer: EOSS
◉ What chart helps keep track of what equipment is on line Answer:
status chart
◉ why is oil in bilges considered hazardous Answer: generate
vapors that can ignite with a spark or open flame
◉ parts per million of oily waste that is sufficient to cause a sheen
Answer: 15-20
◉ Mark 2 spill kit location Answer: main deck
◉ complete discontinuation of all discharges of oily waste Answer:
OPA