◉ Design-Build contracts require. Answer: The QC Manager to be in
place and take an active role in the review and coordination of the
design.
◉ Which of the following is included in all three phases of the Three
Phases of Control. Answer: Safety
◉ The purpose of Construction Quality Management is to. Answer:
Achieve the quality established by properly developed requirements
through the combined responsibility, but separate, efforts of contractors
and government personnel
◉ Testing is extremely important in construction quality management
and is performed by. Answer: Both the contractor and the government
,◉ The primary purpose of the Three-Phase Control System is to.
Answer: Require the contractor to plan, schedule, and perform quality
management actions to assure work meets all specified quality standards
◉ Quality Assurance Personnel have the responsibility to. Answer:
Require the contractor to maintain the quality specified in the plans and
specifications
◉ The _________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and approved.
Answer: Preparatory Phase
◉ The Preconstruction Conference and Coordination and Mutual
Understanding Meeting Are. Answer: Conducted prior to the
commencement of any physical construction work
◉ Contractor testing procedures:. Answer: Are specified in the technical
specs, outlined in the QCP, and addressed at Coordination and Mutual
Understanding Meeting
◉ The Quality Control Plan contains. Answer: Identification of
individual quality quality control personnel, including name,
qualifications, assigned duties, responsibilities and authorities.
, ◉ Tests that are unannounced, randomly performed, and repeat quality
control tests are. Answer: Quality assurance tests
◉ The contractor is required to conduct a Preparatory Phase Meeting
before they begin any definable feature of work except when. Answer:
There are no exceptions to the rule
◉ During the punch-out inspection of a project:. Answer: Quality
Control personnel prepare and punch-list and make corrections
◉ The Quality Control Report should include. Answer: All of the above
◉ In a design build contract, if the contractor has a question about the
design, what is the process to get an answer. Answer: Contractor submits
a design verification request to the contractor's design team
◉ Submittals are. Answer: Necessary to demonstrate that the proposed
materials, etc. are in compliance with the contract.
◉ The success or failure of all contractors is based upon. Answer: The
ability to control costs, finance work, estimate jobs, schedule the work
and maintain effective quality control
◉ The contract requires the contractor to submit quality control reports.
Answer: Daily
CONTRACTORS FINAL EXAM SCRIPT 2026
COMPLETE QUESTIONS AND ANSWERS 100%
CORRECT
◉ Design-Build contracts require. Answer: The QC Manager to be in
place and take an active role in the review and coordination of the
design.
◉ Which of the following is included in all three phases of the Three
Phases of Control. Answer: Safety
◉ The purpose of Construction Quality Management is to. Answer:
Achieve the quality established by properly developed requirements
through the combined responsibility, but separate, efforts of contractors
and government personnel
◉ Testing is extremely important in construction quality management
and is performed by. Answer: Both the contractor and the government
,◉ The primary purpose of the Three-Phase Control System is to.
Answer: Require the contractor to plan, schedule, and perform quality
management actions to assure work meets all specified quality standards
◉ Quality Assurance Personnel have the responsibility to. Answer:
Require the contractor to maintain the quality specified in the plans and
specifications
◉ The _________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and approved.
Answer: Preparatory Phase
◉ The Preconstruction Conference and Coordination and Mutual
Understanding Meeting Are. Answer: Conducted prior to the
commencement of any physical construction work
◉ Contractor testing procedures:. Answer: Are specified in the technical
specs, outlined in the QCP, and addressed at Coordination and Mutual
Understanding Meeting
◉ The Quality Control Plan contains. Answer: Identification of
individual quality quality control personnel, including name,
qualifications, assigned duties, responsibilities and authorities.
, ◉ Tests that are unannounced, randomly performed, and repeat quality
control tests are. Answer: Quality assurance tests
◉ The contractor is required to conduct a Preparatory Phase Meeting
before they begin any definable feature of work except when. Answer:
There are no exceptions to the rule
◉ During the punch-out inspection of a project:. Answer: Quality
Control personnel prepare and punch-list and make corrections
◉ The Quality Control Report should include. Answer: All of the above
◉ In a design build contract, if the contractor has a question about the
design, what is the process to get an answer. Answer: Contractor submits
a design verification request to the contractor's design team
◉ Submittals are. Answer: Necessary to demonstrate that the proposed
materials, etc. are in compliance with the contract.
◉ The success or failure of all contractors is based upon. Answer: The
ability to control costs, finance work, estimate jobs, schedule the work
and maintain effective quality control
◉ The contract requires the contractor to submit quality control reports.
Answer: Daily