Which of the following equipment may NOT be required for a pressure test? internal line
clamps


before testing begins, a ________ with explanatory notes and data should be prepared
pressure test procedure


the pressure testing of newly constructed liquid pipelines and replaced segments of existing
pipelinesshould be performed in accordance with ASME B31.4, 49 Code of Federal
Regulations, Part 195 and any other applicable governmental
regulations.


Before the actual line filling operation, it is advisable to run a _________ in an effort to identify
any

geometric abnormalities that may exist in the line prior to the test Sizing pig, caliper or
deformation tool



Personnel conducting a pressure test should keep: Complete record of the test, including
details of the test operation and events such as weather
variations, test failures, bleedoffs, repressurizations, and so forth


According to API 1169 an INSPECTOR is an individual qualified to monitor, assess, evaluate,
verify,
discuss, decide, resolve, report, and document pipeline construction activities to ensure the
requirements of the design, drawings, specifications, regulations, and industry practices are
being met

safely, efficiently, and in an environmentally sound manner. true


Quality Assurance includes those activities focused on providing confidence that quality
requirements

,are consistently fulfilled true


Inspectors are NOT empowered and expected to shut down any work on the basis of, but not
limited to
situations or activities that have occurred, are occurring, or may occur that could result in:
work schedule of the contractor


Inspection Personnel are expected to interact with representatives of newspapers, TV, or other
media

seeking information false


Inspectors should evaluate the following areas to avoid incidents and raise awareness of
hazards,

except: Traffic Congestion - at the local Walmart when a sale is in progress


According to API, Q1, Specification for Quality Programs, calibration is a comparison to a
standard of

known accuracy and making any needed adjustments. true


According to API, Q1, Specification for Quality Programs, calibration is a comparison to a
standard of

known accuracy and making any needed adjustments. management



Regarding training and awareness, the organization shall: Provide for quality management
system training and job training;
Maintain appropriate records of education, training, skills, and experience;



The quality management system documentation shall include the following, except for: All
federally required processes regarding the project at hand

, Regarding design and development review, at suitable stages, review(s) shall be performed:
To evaluate the suitability, adequacy, and effectiveness of the results of design and
development
stages to meet specified requirements;
To identify any problems and propose necessary actions;



The Contingency Plan shall include the following, at a minimum: Actions required in
response to significant risk scenarios to mitigate effects of disruptive incidents;
Identification and assignment of responsibilities and authorities;
Internal and external communication controls



Where arc welding is regularly carried out, adjacent walls and other surfaces shall have: Low
reflectivity to ultraviolet radiation


When using cleaning compounds prior to welding, __________ instructions shall be followed
manufacturers


Fire watchers shall be posted where welding or cutting is done and where a large fire might
develop, or

whenever any of the following conditions exist: Proximity of Combustibles - Combustible
materials in building construction or contents are closer
that a radius of 35 feet to the point of operation.
Openings - There are wall or floor openings within a radius of 35 feet which expose combustible
material in adjacent areas, including concealed spaces in walls, ceilings or floors.
Metal Walls and Pipes - Combustible materials adjacent to the opposite side of metal partitions,
walls, ceiling, or roofs, or in contact with pipes, and are likely to be ignited by conduction or
radiation.

Información del documento

Subido en
5 de enero de 2026
Número de páginas
19
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FredJohnson
4.0
(6)
Vendido
59
Seguidores
2
Artículos
17861
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes