SWPPP TEST WITH COMPLETE SOLUTIONS

Vista previa del contenido

Swppp Test With Complete Solutions v v v v




The law that set into place stormwater regulations in the 1970s is - correct answer-
v b v b v b v b v b v b v b v b v b v b v b v b v b vb v b


The Clean Water Act v b v b v b




Regulations for managing stormwater activity on a construction site are outlined in v b v b v b v b vb v b v b v b v b v b v b


the - correct answer-NPDES
v b v b v b vb v b




When should you read and understand your project stormwater pollution prevention
v b v b v b v b v b v b v b v b v b v b


plan - correct answer-Immediately after the project awarded and before you begin
v b v b v b vb v b v b v b v b v b v b v b v b v b


any site work is
v b v b v b v b




Which of the following is not an allowable stormwater discharge or non-stormwater
v b v b v b v b v b v b v b v b v b v b v b


discharge - correct answer-Discharges are contaminated groundwater
v b v b v b vb v b v b v b v b




Construction activity may begin - correct answer-When the jurisdiction of operation v b v b v b v b v b vb v b v b v b v b v b


specifies you can start
v b v b v b v b




Waters that sell anti-degration standards are placed on the _______ list - correct
v b v b v b v b v b v b v b v b v b v b v b v b vb


answer-303D
v b




SWPP certifications are signed by - correct answer-An officer of the project owner
v b v b v b v b v b v b vb v b v b v b v b v b v b


or an officer of the general contractor.
v b v b v b v b v b v b v b




TRUE OR FALSE: The document that must be completed signed and submitted to
v b v b v b v b v b v b v b v b v b v b v b v b


the state to obtain authorization to discharge is the NOT - correct answer-False
v b v b v b v b v b v b v b v b v b v b v b v b vb v b




The notice of termination can be filed when - correct answer-All construction inside
v b v b v b v b v b v b v b v b v b vb v b v b v b


and outside of the building is completed and the final stabilization has been verified
v b v b v b v b v b v b v b v b v b v b v b v b v b v b


as complete
v b v b




Operators on a construction site are the entity in charge of plans and specifications v b v b v b v b v b v b v b v b v b v b v b v b v b


and the entity who is - correct answer-Is in charge of daily activities
v b v b v b v b v b v b v b vb v b v b v b v b v b v b




You should have a SWPPP for your construction site because (3 reasons) - correct
v b v b v b v b v b v b v b v b v b v b v b v b v b vb


answer-1. Its documents stormwater management
v b v b v b v b v b v b


2. Demonstrates your intent to manage stormwater on your site
v b v b v b v b v b v b v b v b v b v b


3. It is required by law
v b v b v b v b v b

, A well constructed SWPPP for your site should be - correct answer-Site specific
v b v b v b v b v b v b v b v b v b v b vb v b v b




The NO must be submitted - correct answer-Prior to you commencing construction
v b v b v b v b v b v b vb v b v b v b v b v b




One necessary component of a good SWPPP is - correct answer-A schedule of
v b v b v b v b v b v b v b v b v b vb v b v b v b


activities
v b




Factors that may impact the SWPPP scheduling activities include - correct answer-
v b v b v b v b v b v b v b v b v b v b vb v b


Weather and climate v b v b




Pollutant sources on a construction site may include (3) - correct answer-1. v b v b v b v b v b v b v b v b v b v b vb v b


petroleum storage tanks
v b v b v b v b


2. Masonry materialv b v b v b


3. soil amendment v b v b




The following considerations may be incorporatedd into SWPPP - correct answer-
v b v b v b v b v b v b v b v b v b vb v b


Endangered species and historical preservation v b v b v b v b




If you beileve BMP modifications are necessary onsite you must, - correct answer-
v b v b v b v b v b v b v b v b v b v b v b vb v b


Seek written approval of the project SWPPP designer and project owner
v b v b v b v b v b v b v b v b v b v b




The SWPPP will contain the following (3) - correct answer-1. Erosion and sediment
v b v b v b v b v b v b v b v b vb v b v b v b v b


control bet management practices
v b v b v b v b v b


2. A site specific sequence of construction activiites
v b v b v b v b v b v b v b v b


3. site maps v b v b




Once a site has experienced a rain event of measurable quantity you must identify -
v b v b v b v b v b v b v b v b v b v b v b v b v b v b


vcorrect answer-Deficit and fialed BMP's and repair
b vb v b v b v b v b v b v b




The document that contains the permit number is - correct answer-The permit
v b v b v b v b v b v b v b v b v b vb v b v b


authorization letter
v b v b




The portion of the the SWPPP that specifies the content of the SWPPP is - correct
v b v b v b v b v b v b v b v b v b v b v b v b v b v b v b vb


answer-The table of contents
v b v b v b v b




The document in the SWPPP that certifies the GC's commitment to compliance with
v b v b v b v b v b v b v b v b v b v b v b v b


the SWPPP - correct answer-The SWPPP certification letter
v b v b v b v b vb v b v b v b v b




The certifactions letter that identifies the name and contact information of
v b v b v b v b v b v b v b v b v b v b


subcontractors on the site is - correct answer-The subcontractors certification form
v b v b v b b
v v b v b v b vb v b v b v b v b




The documents that reveal the total area of disturbance are - correct answer-The
v b v b v b v b v b v b v b v b v b v b v b vb v b


site maps
v b v b




The document completed by the project SWPPP inspector recording site conditions
v b v b v b v b v b v b v b v b v b v b


during the inspection is - correct answer-The inspection report form
v b v b v b v b v b v b vb v b v b v b v b




The document that must be completed to report hazardous spill on site is - correct
v b v b v b v b v b v b v b v b v b v b v b v b v b v b vb


answer-The spill report form
v b v b v b v b

Información del documento

Subido en
2 de enero de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Smartscroll
4.3
(6)
Vendido
23
Seguidores
6
Artículos
3038
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes