Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

SAFe Advanced Scrum Master Practice Test (2026 ).

Puntuación
-
Vendido
-
Páginas
20
Grado
A+
Subido en
01-01-2026
Escrito en
2025/2026

SAFe Advanced Scrum Master Practice Test (2026 ).

Institución
SASM - SAFe Advanced Scrum Masters
Grado
SASM - SAFe Advanced Scrum Masters

Vista previa del contenido

SAFe Advanced Scrum Master
Practice Test (4.6) | 2026 –
Why should team members continuously and actively engage with other teams during
PI Planning? - ANSWER---- camila answer: C or A5'
-C
--A
A.To manage dependencies and resolve impediments

B. To understand how the other team is working

C. To foster an environment of capacity and velocity

D. To create a backlog of features the team can adopt
--
https://www.scaledagileframework.com/pi-planning/

`What are two Release Train Engineer responsibilities? (Choose two.) - ANSWER----
camila answer: A & C*


A. Facilitate PI Planning readiness and the event itself

B. Understand Customer needs; validate solutions

C. Drive relentless improvement through Inspect and Adapt

D. Build an effective Product Owner / Product Manager team

E. Manage and prioritize the flow of work to the program
--
https://www.scaledagileframework.com/release-train-engineer-and-solution-train-
engineer/

`What anti-pattern can emerge during the Scrum of Scrums? - ANSWER---- camila
answer: D*


A. Scrum Masters bring in risks and impediments for escalation

B. Scrum Masters work with the Release Train Engineer to resolve risks and
impediments

,C. Scrum Masters have a daily 15 minute meet-after with the Release Train Engineer

D. Scrum Masters report on the teams' task status each day
--
https://www.agilest.org/scaled-agile/scrum-of-scrums/
--
https://www.scaledagileframework.com/scrum-master/

`What action should be taken on Relentless Improvement Backlog items from the
Problem Solving Workshop? - ANSWER---- camila answer: C * >


A. Assign points or prioritization levels

B. Calculate for cost before continuing

C. Use as direct input into the PI Planning session that follows

D. Assign to the team best suited to solve
--
https://www.scaledagileframework.com/inspect-and-adapt/

`According to Daniel Pink, which three factors drive motivation and lead to better
performance and personal satisfaction? (Choose three.) - ANSWER---- *camila answer:
B, C, F

A. Reward
B. Mastery
C. Purpose
D. Recognition
E. Responsibility
F. Autonomy
--
https://www.scaledagileframework.com/unlock-the-intrinsic-motivation-of-knowledge-
workers/

`Which statement is true about the phase-gate milestone model and risk reduction? -
ANSWER---- camila answer: A*

A. It does not mitigate risk as intended
B. It creates large batches of requirements
C. It reduces product increment values
D. It helps to visualize and limit WIP
--
https://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-
working-systems/

, `When does the Inspect and Adapt event happen? - ANSWER---- camila answer: D

A. At the end of the System Demo
B. At the end of every two weeks
C. At the end of the second day of PI Planning
D. At the end of each PI
--
https://www.scaledagileframework.com/inspect-and-adapt/

`Who reviews the top capabilities for the upcoming PI? - ANSWER---- camila answer:
C*

A. Project Manager
B. Solution Architect/Engineer
C. Solution Management
D. Project Owner
--
https://www.scaledagileframework.com/product-and-solution-management/


`What are three Team Retrospective anti-patterns? (Choose three.) - ANSWER----
*camila answer: A, B, C


A. When the Scrum Master decides what the Retrospective topic(s) will be and directs
the team on specific improvement items to work on

B. When the team's people manager comes in to observe

C. When only part of the team attends

D. When the team commits to working on 1-2 improvement items and adds them to the
next Iteration Backlog

E. When the team reviews their interactions during the last Iteration and identifies 1-2
improvement items to work on as a team

F. When the team reviews their interactions during the last Iteration and identifies 1-2
improvement items for the Product Owner to work on
--
https://www.scaledagileframework.com/iteration-retrospective/

`One of the Scrum Master's main responsibilities is to communicate with management
and outside stakeholders to help the team in what way? - ANSWER---- *camila answer:
B

Escuela, estudio y materia

Institución
SASM - SAFe Advanced Scrum Masters
Grado
SASM - SAFe Advanced Scrum Masters

Información del documento

Subido en
1 de enero de 2026
Número de páginas
20
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
LeeErickson
1.5
(2)

Conoce al vendedor

Seller avatar
LeeErickson Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
11
Miembro desde
1 año
Número de seguidores
1
Documentos
3331
Última venta
4 semanas hace

1.5

2 reseñas

5
0
4
0
3
0
2
1
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes