Foundation slab Guías de estudio, Notas de estudios & Resúmenes
¿Buscas las mejores guías de estudio, notas de estudio y resúmenes para Foundation slab? En esta página encontrarás 284 documentos de estudio para Foundation slab.
All 284 resultados
Ordenador por
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Examen • 10 páginas • 2023
-
Disponible en paquete
-
- 28,90 €
- 3x vendido
- + aprende más y mejor
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
Michigan Builders License Exam Questions With Correct Answers
- Examen • 71 páginas • 2023 Popular
-
Disponible en paquete
-
- 12,31 €
- 3x vendido
- + aprende más y mejor
Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Answer IRC (International Residential Code) 
 
Administrative - Answer First 2 chapters of code book are 
 
True - Answer Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F 
 
Yes - Answer Does the building official have the authority to render interpretations o...
-
MI Residential Builder Test Prep
- Examen • 4 páginas • 2023
-
- 9,94 €
- 1x vendido
- + aprende más y mejor
12" - Answer- A foundation drain shall extend past the outside edge of the footing at least how far? 
 
3/8" - Answer- A concrete masonry foundation wall extends below grade and will require parge coating using Portland cement mortar. What is the minimum allowable thickness? 
 
contacting the local utility companies - Answer- Which is the first step that needs to be taken prior to starting any excavation work? 
 
conducting test borings - Answer- Before excavating for a new building, how shoul...
-
Wood Destroying Organisms Final Exam 2024 with Correct Solutions
- Examen • 7 páginas • 2024
-
Disponible en paquete
-
- 10,13 €
- 1x vendido
- + aprende más y mejor
Wood Destroying Organisms Final Exam 2024 with 
Correct Solutions 
_______ could be coming from the damp, treated soil beneath the slab but should persist for only a day 
or two. - Answer -Odors 
________ formulations of soil-applied termiticides can be delivered to areas difficult to reach with liquid 
formulations. - Answer -foaming 
_________ resemble bumblebees but can be distinguished by their shiny, black, hairless abdomens. - 
Answer -Carpenter bees 
__________ drilling is the most common...
-
Basic Appraisal Procedures – McKissock test questions with verified solutions 2024.
- Examen • 19 páginas • 2024
-
Disponible en paquete
-
- 14,68 €
- 1x vendido
- + aprende más y mejor
Valuation process 
A systematic procedure used in the valuation of real property. 
 
Steps: 
1: Define the problem 
 
2:Determine scope of work 
 
3:Gather, record, and verify the data 
 
4:Determine the highest and best use 
 
5:Estimate the land value 
 
6:Estimate value by each of the three approaches (if applicable) 
 
7:Reconcile the estimated values into the final opinion of value 
 
8:Report the final opinion of value 
 
 
 
Client 
The party or parties who engage, by employment or contra...
-
Michigan Builder 2 Residential Contractors License Study Exam|2023 LATEST UPDATE|GUARANTEED SUCCESS
- Examen • 13 páginas • 2023
-
Disponible en paquete
-
- 11,84 €
- 1x vendido
- + aprende más y mejor
An attached garage shall be separated from all habitable rooms above the garage with not less than 
5/8 of an inch gypsum board 
 
 
 
A structure that is intended for swimming or recreational bathing is considered to be a swimming pool if it contains water over 
24 inches 
 
 
 
What type of fastener do you use to install cabinets? 
Truss head wood screws 
 
 
 
The process of preparing sand underneath a concrete slab requires sand to be 
Compacted 
 
 
 
Habitable space in a basement shall hav...
-
AHIT and NHIE Master Study Set 2 Questions and Answers 100% Accurate
- Examen • 109 páginas • 2024
-
Disponible en paquete
-
- 18,47 €
- + aprende más y mejor
AHIT and NHIE Master Study Set 2 Questions and Answers 100% Accurate 
Columns and piers are generally inspected from _________________. 
 
A. the inside of the home 
B. the outside of the home 
C. the basement or crawl space 
D. lifting the subfloor 
C. the basement or crawl space 
 
 
 
Which action is required by most standards of practice? 
 
A. required to enter underfloor crawl spaces and attic spaces if the property has them 
B. required to probe structural components where deterioration i...
-
AHIT and NHIE Master Study Set 2 Correct 100%
- Examen • 109 páginas • 2024
-
Disponible en paquete
-
- 12,79 €
- + aprende más y mejor
Columns and piers are generally inspected from _________________. 
 
A. the inside of the home 
B. the outside of the home 
C. the basement or crawl space 
D. lifting the subfloor - ANSWER C. the basement or crawl space 
 
Which action is required by most standards of practice? 
 
A. required to enter underfloor crawl spaces and attic spaces if the property has them 
B. required to probe structural components where deterioration is suspected 
C. required to report cracks in the foundation only i...
-
RECA Residential Exam| Study Guide with Verified and Detailed Answers|100% Correct| 2023/ 2024
- Examen • 42 páginas • 2023
-
Disponible en paquete
-
- 10,42 €
- + aprende más y mejor
RECA Residential Exam| Study Guide with Verified and Detailed Answers|100% Correct| 2023/ 2024 
 
Q: Cement block? 
 
 
Answer: 
Poured concrete, cement, gravel aggregate and sand. Fills blocks that are hollow but filled with mortar and reinforced with rebar. 
 
 
 
Q: Preserved wood? 
 
 
Answer: 
Load bearing walls built with treated lumber and sheathed with treated plywood. 
-Wood used is treated with preservative chemicals to prevent decay and layered with mortar. 
-Requires certification b...
-
AHIT and NHIE Master Study Set 2 Exam Questions and Answers 2024
- Examen • 146 páginas • 2024
-
- 13,73 €
- + aprende más y mejor
AHIT and NHIE Master Study Set 2 Exam 
Questions and Answers 2024 
Columns and piers are generally inspected from _________________. 
A. the inside of the home 
B. the outside of the home 
C. the basement or crawl space 
D. lifting the subfloor -Correct Answer-C. the basement or crawl space 
Which action is required by most standards of practice? 
A. required to enter underfloor crawl spaces and attic spaces if the property has them 
B. required to probe structural components where deterioration...