CISEC Guías de estudio, Notas de estudios & Resúmenes

¿Buscas las mejores guías de estudio, notas de estudio y resúmenes para CISEC? En esta página encontrarás 77 documentos de estudio para CISEC.

Página 2 fuera de 77 resultados

Ordenador por

CISEC ACTUAL EXAM (20242025) QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ GRADE BOOSTER UPDATE
  • CISEC ACTUAL EXAM (20242025) QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ GRADE BOOSTER UPDATE

  • Examen • 26 páginas • 2024
  • CISEC ACTUAL EXAM 20242025 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ GRADE BOOSTER UPDATE LDP. NPDES CWA Penalty Types What documents are required on site? Who is the "operator"? Also the LRP. When do you need permit coverage? Large Land Development Vertical Projects Bix Box Projects Linear Projects ) What is erosion? What are the three types of Wind Erosion? Which method of wind erosion moves the most soil? What are the types of water erosi...
    (0)
  • 12,94 €
  • + aprende más y mejor
CISEC Exam Latest 2024 Updated Questions with 100% Correct Answers | Updated | Download to score A+
  • CISEC Exam Latest 2024 Updated Questions with 100% Correct Answers | Updated | Download to score A+

  • Examen • 26 páginas • 2024
  • CISEC Exam Latest 2024 Updated Questions with 100% Correct Answers | Updated | Download to score A+ .LDP. NPDES CWA Penalty Types What documents are required on site? Who is the "operator"? Also the LRP. When do you need permit coverage? Large Land Development Vertical Projects Bix Box Projects Linear Projects ) What is erosion? What are the three types of Wind Erosion? Which method of wind erosion moves the most soil? What are the types of water erosion? Raindrop Erosion Sheet Erosion Rill an...
    (0)
  • 12,46 €
  • + aprende más y mejor
CISEC abbreviations Questions with complete solution 2024
  • CISEC abbreviations Questions with complete solution 2024

  • Examen • 16 páginas • 2024
  • CISEC abbreviations Questions with complete solution 2024EPA Environmental Protection Agency S&EC Drawings Sediment and Erosion Control Drawings Brainpower Read More CWA Clean Water Act NPDES National Pollutant Discharge Elimination System BMPs Best Management Practices SW Stormwater
    (0)
  • 12,46 €
  • + aprende más y mejor
CISEC Exam Question and answers correctly solved 2024
  • CISEC Exam Question and answers correctly solved 2024

  • Examen • 13 páginas • 2024
  • CISEC Exam Question and answers correctly solved 2024 LDP - correct answer Land Developing Projects - altering landscape for projects such as agriculture or housing ect. NPDES - correct answer National Pollutant Discharge Elimination System - section of the CWA (Clean Water Act) to permit stormwater discharges associated w industrial activities PER permit CWA Penalty Types - correct answer Adminstrative Class I. Neglegent Class II. Knowlingly = greater fines What documents are ...
    (0)
  • 14,86 €
  • + aprende más y mejor
CISEC Exam Question and answers 2024 verified to pass
  • CISEC Exam Question and answers 2024 verified to pass

  • Examen • 6 páginas • 2024
  • CISEC Exam Question and answers 2024 verified to passWho can file a civil action per the CWA? - correct answer Any citizen Who can have a civil action filed against them? - correct answer Any person, the US, or other government agency, or the EPA When would a governor file a civil suit? - correct answer If there is a violation occurring in another state that is causing an adverse effect on the public health/welfare of their state or for a violation of any water quality requirement in th...
    (0)
  • 13,42 €
  • + aprende más y mejor
CISEC Exam Question and answers already passed 2024
  • CISEC Exam Question and answers already passed 2024

  • Examen • 7 páginas • 2024
  • CISEC Exam Question and answers already passed 2024Stormwater control design goal - correct answer Minimize the discharge of pollutants in stormwater. SW control design factors - correct answer Expected amount and frequency of precipitation, soil type and range, flow from impervious surfaces, slopes, and BMPs to control flow rates. Erosion and sediment control requirements - correct answer Provide and maintain natural buffers and/or equivalent erosion and sediment controls for discharge...
    (0)
  • 13,90 €
  • + aprende más y mejor
CISEC Exam Question and answers 100% correct 2024
  • CISEC Exam Question and answers 100% correct 2024

  • Examen • 6 páginas • 2024
  • CISEC Exam Question and answers 100% correct 2024 Who can file a civil action per the CWA? - correct answer Any citizen Who can have a civil action filed against them? - correct answer Any person, the US, or other government agency, or the EPA When would a governor file a civil suit? - correct answer If there is a violation occurring in another state that is causing an adverse effect on the public health/welfare of their state or for a violation of any water quality requirement in their...
    (0)
  • 13,90 €
  • + aprende más y mejor
CISEC Module 1 EPA Rules and Regulations Question and answers rated A+ 2024
  • CISEC Module 1 EPA Rules and Regulations Question and answers rated A+ 2024

  • Examen • 3 páginas • 2024
  • CISEC Module 1 EPA Rules and Regulations Question and answers rated A+ 2024 Action Area - correct answer All areas to be affected directly or indirectly by the federal action and not merely the immediate area involved in the action. -The areas on the construction site where stormwater discharges originate and flow toward the point of discharge into the receiving waters and the immediate vicinity. -The areas where stormwater discharges flow from the construction site to the point of discharge...
    (0)
  • 10,06 €
  • + aprende más y mejor
CISEC Module 2 Background of an Inspector Questions with complete solution 2024
  • CISEC Module 2 Background of an Inspector Questions with complete solution 2024

  • Examen • 2 páginas • 2024
  • CISEC Module 2 Background of an Inspector Questions with complete solution 2024 Surface creep erosion - correct answer the rolling and sliding movement of particles across a surface. Represent about 5% to 25% of the total soil loss by wind. Creates sand dunes. Saltation erosion - correct answer the hopping and bouncing movement of particles. Particles are lifted into the atmosphere but return to the ground and dislodge other particles. Represent about 50% to 80% of the total loss by wind. T...
    (0)
  • 12,94 €
  • + aprende más y mejor
CISEC EXAM 2024| 150 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS| ALREADY PASSED AND GRADED A+
  • CISEC EXAM 2024| 150 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS| ALREADY PASSED AND GRADED A+

  • Examen • 32 páginas • 2024
  • CISEC EXAM 2024| 150 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS| ALREADY PASSED AND GRADED A+ T/F: The CGP statesthat inspections are to occur only during normal working hours - ANSWER--True T/F: the CGP does not mandate inspection of equipment storage and maintenance areas - ANSWER--False T/F: Since 1998, regulations require permits for Phase I (5 acres or more) projects. Since 2003, permits also required for Phase II (1 or more acres) projects - ANSWER--True T/F: Under the CWA, citize...
    (0)
  • 11,02 €
  • + aprende más y mejor