The New Mexico MM-98 Mechanical Contractor examination evaluates contractors on the administrative, technical, safety, and regulatory requirements for installing, repairing, and maintaining mechanical systems throughout New Mexico. Under the New Mexico Construction Industries Licensing Act (NMSA Chapter 60, Article 13) and the New Mexico Mechanical Code (14.9.2 NMAC), the MM-98 is a comprehensive classification that encompasses heating, ventilation, air conditioning (HVAC), industrial piping, boiler systems, and process piping.
1. Core Examination Topics & Technical Domains
Licensing Laws & Business Administration (CID & CILB Rules):
Qualifying Party (QP) Duties: Responsibilities of the Qualifying Party, active supervision requirements, and mandatory CID notifications within 30 days upon severance.
Permitting & Inspections: Obtaining permits prior to starting work, required inspection milestones (rough-in, pressure testing, final), and Certificate of Occupancy prerequisites.
Contractor Licensing Standards: Compliance with New Mexico Construction Industries Division (CID) regulations, mechanics' lien laws, financial responsibility, and workers' compensation requirements.
Heating, Ventilation, & Air Conditioning (HVAC):
Duct Sizing & Air Distribution: Applying Manual J, D, and S methodologies for load calculations, static pressure loss, velocity limits, and duct construction standards (SMACNA).
Ventilation & Indoor Air Quality: Outside air requirements based on occupancy, mechanical exhaust rates, kitchen hood systems (Type I and Type II), and combustion air provisions.
Boilers, Hydronic Heating, & Pressure Vessels:
Boiler Safety & Controls: Low-water cutoffs, safety relief valve sizing/discharge piping, expansion tank calculations, and ASME Boiler & Pressure Vessel Code compliance.
Hydronic Piping: Pipe sizing, circulator pump head calculations, closed vs. open systems, and thermal expansion management.
Fuel Gas Piping & Combustion Systems:
IFGC & NM Fuel Gas Code: Sizing natural gas and LP-gas piping systems using pressure-drop tables, pipe joining methods, sediment traps, shutoff valve placements, and leak testing protocols (pressure test requirements).
Venting Systems: Category I through IV appliance venting, draft hood installation, sidewall venting clearances, and double-wall (Type B) vent terminations.
Refrigeration & Environmental Safety:
Refrigerant Handling: EPA Section 608 compliance, recovery protocols, safety classifications (A1, A2L, B1, etc.), leak rate thresholds, and machinery room ventilation standards (ASHRAE 15 & 34).
Job Site Safety (OSHA 29 CFR 1926):
Personal protective equipment (PPE), hazard communication, ladder and scaffolding safety, trenching/excavation, lockout/tagout (LOTO), and confined space entry.
2. Representative Exam Questions & Correct Answers
Question 1: Fuel Gas Pipe Sizing & Testing
Scenario: According to the New Mexico Fuel Gas Code, what is the minimum duration and pressure required for a standard pneumatic pressure test on a newly installed metallic fuel gas piping system before connecting appliances?
A) 5 psi for 5 minutes
B) 10 psi for 15 minutes (or not less than 1.5 times the proposed working pressure)
C) 30 psi for 2 hours
D) 50 psi for 24 hours
Correct Answer: B) 10 psi for 15 minutes (or not less than 1.5 times the proposed working pressure)
Rationale: Standard fuel gas code rules require low-pressure metallic gas piping to be pressure tested at a minimum of 10 psig (or 1.5 times operating pressure) for no less than 15 minutes to verify joint integrity prior to placing the line in service.
Question 2: Boiler Safety Controls
Scenario: On an automatically fired steam or hot water heating boiler, what device is mandatory to prevent firing in the event of an unsafe low-water level condition?
A) Backflow preventer
B) Low-Water Cutoff (LWCO)
C) Aquastat
D) Thermostatic expansion valve
Correct Answer: B) Low-Water Cutoff (LWCO)
Rationale: The Low-Water Cutoff automatically interrupts the fuel or electrical supply to the burner if the water level drops below the safe operating threshold, preventing severe thermal shock, shell failure, or explosion.
Question 3: Qualifying Party Severance Notification
Scenario: Under the New Mexico Construction Industries Licensing Act, if a designated Qualifying Party leaves a licensed contracting business entity, within how many days must the licensee notify the Construction Industries Division (CID)?
A) 10 days
B) 30 days
C) 60 days
D) 90 days
Correct Answer: B) 30 days
Rationale: NMSA rules mandate that a licensee must notify the CID in writing within 30 days of the disassociation of a Qualifying Party. The business must qualify a new QP within the statutory grace period to maintain an active license.
Question 4: Combustion Air Requirements
Scenario: When supplying indoor combustion air for gas-fired appliances using the two-permanent-openings method (one near the top and one near the bottom of the enclosure), each opening must have a minimum free area based on what ratio relative to total input rating?
A) 1 square inch per 1,000 Btu/hr
B) 1 square inch per 2,000 Btu/hr
C) 1 square inch per 4,000 Btu/hr
D) 1 square inch per 5,000 Btu/hr
Correct Answer: C) 1 square inch per 4,000 Btu/hr
Rationale: When drawing indoor air from adjacent spaces using two permanent openings, each opening must offer a net free area of at least 1 square inch per 4,000 Btu/hr of the total input rating of all appliances in the space.
Question 5: Type B Gas Vent Clearances
Scenario: What is the standard minimum clearance to combustible construction required for a factory-built Type B double-wall gas vent pipe?
A) 0 inches (zero clearance)
B) 1 inch
C) 6 inches
D) 12 inches
Correct Answer: B) 1 inch
Rationale: Standard Type B double-wall gas vents are listed for a minimum 1-inch clearance to combustible materials unless specified otherwise by the manufacturer's listing.
Vista previa del contenido
Page 1 of 119
NM MM-98 Mechanical Contractor
Exam QUESTIONS AND CORRECT
ANSWERS
NM MM-98 Mechanical Contractor Exam: 250 Randomized Scenario-
Based MCQs with Rationales
Exam Coverage Summary: The MM-98 Combined Mechanical license
encompasses the scope of MM-1 (Plumbing), MM-2 (Natural Gas
Fitting), MM-3 (HVAC), and MM-4 (Process Piping), plus MS-3 (Septic),
MS-6 (Lawn Sprinklers), MS-12 (Fire Sprinkler), and MS-14 (Dry
Chemical Fire Protection) . The exam is administered by PSI under the
New Mexico Construction Industries Division (CID). Each trade
component requires a passing score of 75%, and all exams are open-
book . Core references include the Uniform Mechanical Code (UMC),
, Page 2 of 119
Uniform Plumbing Code (UPC), International Fuel Gas Code (IFGC),
ASHRAE 15, and OSHA 29 CFR 1926 .
Section 1: Plumbing (MM-1 Scope) — Questions 1–50
1. A contractor is installing a residential water heater and must verify
the temperature and pressure relief valve discharge pipe termination.
Where must this pipe terminate?
A. Above the roof line
B. Into the sewer drain
C. Within 6 inches of the floor
D. Into the vent stack
Answer: C
The T&P discharge must terminate near the floor to prevent scalding
and allow safe drainage if the valve activates. Terminating above a roof
or into a drain creates hazards or code violations.
2. During a rough-in inspection, the inspector notes that a plumbing
vent terminates less than 6 inches above the roof surface in a snow-
prone area. What is the primary safety concern?
A. Vent gases will corrode the roofing material
B. Snow accumulation may block the vent and trap sewer gases
C. The vent will freeze and burst
D. Rainwater will enter the drainage system
, Page 3 of 119
Answer: B
Vents must extend at least 6 inches above the roof to prevent blockage
by snow or debris. A blocked vent can cause sewer gases to enter the
building and interfere with drainage.
3. A contractor is selecting copper tubing for an underground water
service line passing through corrosive soil. Which copper type is most
appropriate?
A. Type M
B. Type L
C. Type K
D. Type DWV
Answer: C
Type K copper has the thickest wall and is the standard choice for
underground burial and heavy-duty plumbing applications where
corrosion or physical damage is a concern.
4. A plumbing system uses an atmospheric vacuum breaker on a hose
bibb circuit. What condition must exist for the AVB to function
properly?
A. Continuous water pressure downstream
B. No downstream shutoff valves or continuous pressure
C. A pressure-reducing valve upstream
, Page 4 of 119
D. The device must be installed below grade
Answer: B
AVBs are designed for non-continuous pressure applications. Installing
shutoff valves downstream can trap pressure and prevent the vacuum
breaker from functioning, creating a backflow hazard.
5. A contractor is installing a P-trap beneath a lavatory. What is the
primary function of this component?
A. To increase water pressure at the fixture
B. To retain a water seal that blocks sewer gases from entering the
space
C. To filter debris before it enters the drain
D. To regulate the flow rate to the fixture
Answer: B
P-traps retain a small amount of water that acts as a barrier, preventing
sewer gases from migrating backward into occupied spaces through the
drain.
6. A commercial kitchen requires a grease interceptor. Where must
this device be installed relative to the fixtures it serves?
A. On the roof above the kitchen
B. Downstream of the fixtures and before the main sewer line
C. Inside the walk-in cooler