Demolitions Study guides, Study notes & Summaries

Looking for the best study guides, study notes and summaries about Demolitions? On this page you'll find 157 study documents about Demolitions.

All 157 results

Sort by

Michigan Residential Builder's License Test With Correct Solution Popular
  • Michigan Residential Builder's License Test With Correct Solution

  • Exam (elaborations) • 114 pages • 2023
  • Available in package deal
  • What is the 1st offense penalty for engaging in the practice of residential building without a license? - Answer Not less than $5K and not more than $25K and/or 1 year What is the penalty for engaging in the practice of residential building, resulting in a death? - Answer Not less than $5K and not more than $50K and/or 4 years On your individual builder's license application, what should you write as your "business address"? - Answer Your personal address What is the cost of the individ...
    (1)
  • R221,78
  • 2x sold
  • + learn more
S-56 FIRE SAFETY MANAGER| 57 QUESTIONS AND ANSWERS ALREADY GRADED A+|GUARANTEED SUCCESS Popular
  • S-56 FIRE SAFETY MANAGER| 57 QUESTIONS AND ANSWERS ALREADY GRADED A+|GUARANTEED SUCCESS

  • Exam (elaborations) • 6 pages • 2023 Popular
  • Available in package deal
  • Standpipe maintained under pressure and equipped with low pressure alarm Maintained as needed Standpipe including piping leading to FD connection, inspected visually Daily construction drawings used to confirm routing of unexposed standpipe sections Daily FDNY/CSFM daily reports must be kept by documenting standpipe inspections, fire extingusher inspections,and upkeep permit logs Daily FDNY first responders box maintenance and execution evacuation drills daily, q...
    (0)
  • R289,33
  • 2x sold
  • + learn more
Demolition Operations Actual  Exam Questions With Answers
  • Demolition Operations Actual Exam Questions With Answers

  • Exam (elaborations) • 19 pages • 2023
  • Available in package deal
  • Demolition Operations Actual Exam Questions With Answers Which method of attack is preferred on a steel truss deck bridge with top supports? - ANSWER- bottom attack Using the Hasty method, how many total packages of C4 (M112) would be required to breach a reinforced concrete wall, which is 7 feet thick, and 16 feet wide, using elevated untamped charges? - ANSWER- 200 What is the value of "k" when you are destroying a 5-foot thick dense concrete wall using external charge? - ANSWER-...
    (0)
  • R250,73
  • 1x sold
  • + learn more
Demolitions Exam 2022 with Questions and Answers
  • Demolitions Exam 2022 with Questions and Answers

  • Exam (elaborations) • 3 pages • 2022
  • Demolitions Exam 2022 with Questions and Answers...
    (0)
  • R171,59
  • 1x sold
  • + learn more
DEMOLITIONS EXAM 2023-2024 ACTUAL EXAM 70 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|ALREADY GRADED A
  • DEMOLITIONS EXAM 2023-2024 ACTUAL EXAM 70 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|ALREADY GRADED A

  • Exam (elaborations) • 10 pages • 2023
  • DEMOLITIONS EXAM ACTUAL EXAM 70 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|ALREADY GRADED A
    (0)
  • R434,10
  • + learn more
EBOLC Demolition Questions with correct answers
  • EBOLC Demolition Questions with correct answers

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • Never attach M456 Det Cord, an M151, or an M152 to this component. CORRECT ANSWER M81 An _________ can accommodate and ensure proper proximity for initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456 Det Cord. CORRECT ANSWER M9 Holder This component has a high-strength blasting cap, factory-crimped to a 30-ft length of shock tube. It also has a small J-hook for easy attachment to M456 Let Cord, a yellow flag 2 meters from the blasting cap and a red flag 1 meter from the blasti...
    (0)
  • R279,68
  • + learn more
EBOLC Demolition Questions with correct answers
  • EBOLC Demolition Questions with correct answers

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • EBOLC Demolition Questions with correct answers
    (0)
  • R250,73
  • + learn more
Demolitions Exam Questions and Answers 2023
  • Demolitions Exam Questions and Answers 2023

  • Exam (elaborations) • 3 pages • 2023
  • Demolitions Exam Questions and Answers 2023
    (0)
  • R221,78
  • + learn more
Demolition Operations Actual  Exam Questions With Answers
  • Demolition Operations Actual Exam Questions With Answers

  • Exam (elaborations) • 19 pages • 2023
  • Demolition Operations Actual Exam Questions With Answers Which method of attack is preferred on a steel truss deck bridge with top supports? - ANSWER- bottom attack Using the Hasty method, how many total packages of C4 (M112) would be required to breach a reinforced concrete wall, which is 7 feet thick, and 16 feet wide, using elevated untamped charges? - ANSWER- 200 What is the value of "k" when you are destroying a 5-foot thick dense concrete wall using external charge? - ANSWER-...
    (0)
  • R250,73
  • + learn more
Demolitions Exam 2023/2024 with Questions and Answers
  • Demolitions Exam 2023/2024 with Questions and Answers

  • Exam (elaborations) • 5 pages • 2023
  • Demolitions Exam 2023/2024 with Questions and Answers Demolitions Exam 2023/2024 with Questions and Answers
    (0)
  • R193,02
  • + learn more
EBOLC Demolition Questions With  Answers
  • EBOLC Demolition Questions With Answers

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • EBOLC Demolition Questions With Answers Never attach M456 Det Cord, an M151, or an M152 to this component. - CORRECT ANSWER- M81 An _________ can accommodate and ensure proper proximity for initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456 Det Cord. - CORRECT ANSWER- M9 Holder This component has a high-strength blasting cap, factory-crimped to a 30-ft length of shock tube. It also has a small J-hook for easy attachment to M456 Let Cord, a yellow flag 2 meters from ...
    (0)
  • R250,73
  • + learn more