Project scope Study guides, Study notes & Summaries
Looking for the best study guides, study notes and summaries about Project scope? On this page you'll find 7778 study documents about Project scope.
Page 4 out of 7.778 results
Sort by
-
APM PMQ Exam Revision Questions With Verified Answers
- Exam (elaborations) • 80 pages • 2023
- Available in package deal
-
- R274,23
- 1x sold
- + learn more
What are the five criteria for a successful project? - Answer Time, cost, quality, risk & benefits 
 
Project Management - Answer The application of processes, methods, knowledge, skills and experience to achieve the project objectives 
 
Programme Management - Answer The coordinated management of projects and change manage activities to achieve beneficial change 
 
Project Success - Answer The satisfaction of stakeholder needs measured by the success criteria as identified and agreed at the sta...
-
Project Management Exam Questions and Answers
- Exam (elaborations) • 20 pages • 2023
- Available in package deal
-
- R207,99
- 1x sold
- + learn more
Project Management Exam Questions and Answers 
Project - ANSWER A temporary endeavor undertaken to create a unique product service or result 
 
Management - ANSWER Act ot coordinating the efforts of people to accomplish desired goals and objectives using available resources (eg. Money, workers, equipment, manpower) 
 
Includes: 
-Identifying requirements 
-Establishing clear and achievable objectives 
-Balancing the competing demands for quality, scope time and cost 
-...
-
AFSB 152 - The Institutes Practice Exam Questions and Answers 2023
- Exam (elaborations) • 24 pages • 2023
- Available in package deal
-
- R397,24
- 1x sold
- + learn more
AFSB 152 - The Institutes Practice Exam Questions and Answers 2023 
Lansing Construction Company completed major jobs including road grading, bridges, and base and paving work. Which one of the following types of contractors is Lansing? 
• Heavy and highway construction 
• General Engineering contractor 
• General Building contractor 
• Design/build contractor - Correct Answer-Heavy and highway construction 
 
The project owner for a new shopping plaza being built in Highville is the Hig...
-
Unit 9 - Assignment 1 - Investigating Project Management (Grade: Distinction)(Covers Criteria: P1, P2, M1, D1)
- Essay • 26 pages • 2023
- Available in package deal
-
- R181,10
- 2x sold
- + learn more
This document received DISTINCTION covering aims: P1, P2, M1, and D1 in unit 9: Project Management in Pearson's BTEC level 3 course in Information Technology. 
 
Note: This document should ONLY be used for inspiration and all buyers should adhere to guidelines that are in place to avoid potential plagiarism. 
 
It covers various topics including, but not limited to: 
 
Basics of project management; scope and stages of project management. 
 
Project management structures; requirements(functional...
-
APM - PFQ (PFQ) Practice Tests/ APM PFQ Exam Questions & Answers Test Bank_2023.
- Exam (elaborations) • 54 pages • 2023
-
- R217,45
- 1x sold
- + learn more
APM - PFQ (PFQ) Practice Tests/ APM PFQ Exam Questions & Answers Test Bank_2023. 
 
Which of the following is not a stage in an issue resolution process? 
a. Share the issue with stakeholders. 
b. Track the issue to closure. c. Escalate to the sponsor. 
d. Apply change control. 
A 
Which of the following are challenges for a project manager developing and leading a project team? 
1) Issues and incompatibility amongst team members 
2) Getting the right skills and attributes amongst team members 
...
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- R577,03
- 3x sold
- + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
APM PMQ 2023 Exam Questions with Complete Solutions
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- R236,38
- 2x sold
- + learn more
APM PMQ 2023 Exam Questions with Complete Solutions 
Project variables/constraints - CORRECT ANSWERS Time 
Cost 
Quality 
Risk 
Benefit 
Scope 
 
Benefits of project management - CORRECT ANSWERS Improved project communication 
Effective resource management 
Better delivery of results 
Facilitates risk-taking 
Lessons learned 
Improved governance 
 
Challenges of project management - CORRECT ANSWERS Bureaucracy 
Limits creativity 
Threatens existing organisation structure 
C...
-
AACE CST Primer (AACE Certified Scheduling Technician Exam) Questions With Complete Solutions
- Exam (elaborations) • 3 pages • 2023
-
- R170,14
- 2x sold
- + learn more
Work Breakdown Structure [WBS] correct answer: hierarchy division of the work scope elements of a project 
to be performed. 
 
Function of WBS correct answer: to divide the scope of work into manageable parts that correspond to key deliverables, phases, or milestones with the intent to avoid the omission of key elements and assist in the communication of cost, schedule, quality, and resource performance data to stakeholders. 
 
Schedule Specification states correct answer: - Planning and sche...
-
Project Management Samenvatting
- Summary • 30 pages • 2023
- Available in package deal
-
- R102,66
- 3x sold
- + learn more
Samenvatting Project Management. Deze samenvatting is gebaseerd op de lessen.
-
Procore Final Exam Questions and Answers Already Passed
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- R170,14
- 3x sold
- + learn more
Procore Final Exam Questions and Answers Already Passed 
True or False: When you link an RFI to a drawing, you will see the drawing linked on the RFI's view page. T 
True or False: Punch List templates are only available for use on Procore's mobile application. T 
True or False: Observations can only be created using an observation template. F 
If you are tracking a folder (not a file), when will you receive an email notification from Procore? a. When a new file is added to the tracked folder ...