100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MNB1601 Assignment 4 Semester 1 2024

Rating
-
Sold
5
Pages
291
Grade
A+
Uploaded on
18-02-2024
Written in
2023/2024

MNB1601 Assignment 4 Semester 1 2024 Distinction guaranteed












Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
February 18, 2024
Number of pages
291
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

MNB 1601
ASSIGNMENT 4 SEMESTER 1 2024



Use this document as a guide to learn, compare and reference

,EXPECTVIEW TUTORS

,2/18/24, 6:10 PM Assessment 4: Attempt review

Started on Sunday, 18 February 2024, 6:03 PM
State Finished
Completed on Sunday, 18 February 2024, 6:10 PM
Time taken 6 mins 58 secs
Marks 20.00/20.00
Grade 100.00 out of 100.00

Question 1 Quality planning and control can be divided into six steps. Which one of the following options represents the second step in this process?
Correct
Mark 1.00 out of Select one:
1.00 a. Setting standards for each quality characteristic.
Flag question b. Defining the quality characteristics.
c. Measuring the quality characteristics.
d. Controlling quality against the set standards.



The correct answer is: Measuring the quality characteristics.



Question 2 Different operations have different characteristics and the processes may differ fundamentality in four ways (the four Vs). Which one of the following Vs
Correct will influence the cost of making a product or delivering a service, given that a lower production cost per unit is possible, if the fixed cost is spread over a
larger number of units?
Mark 1.00 out of
1.00
Select one:
Flag question
a. Volume of output
b. Variety of output
c. Variation of output
d. Visibility of output



The correct answer is: Volume of output



Question 3 Quality planning and control can be divided into six steps. Which one of the following options represents the third step in this process?
Correct
Mark 1.00 out of Select one:
1.00 a. Setting standards for each quality characteristic.
Flag question b. Defining the quality characteristics.
c. Measuring the quality characteristics.
d. Controlling quality against the set standards.



The correct answer is: Setting standards for each quality characteristic.



Question 4 During 2019, a new 22,700m² food production facility belonging to In2food was opened in the OR Tambo Special Economic Zone in Johannesburg.
Correct Described as the largest and most diverse ultra-fresh food facility of its kind in the southern hemisphere, and the second largest C02 refrigeration facility
in the world, the new Bonaero site created 600 new jobs. Should the Bonaero site make use of standard operating procedures which encourages smaller,
Mark 1.00 out of
incremental changes to take place in the functioning of the operations process, which approach to improvement has In2Food taken?
1.00

Flag question Select one:
a. Breakthrough improvement
b. Business process re-engineering
c. Kaizen improvements
d. Fundamental improvements



The correct answer is: Kaizen improvements



Question 5 The importance of production and operations management (POM) and the operations system becomes clear when your life depends on it. No airline
Correct passenger would want to know that some airlines, airports or aircraft are bad and some are good. There should only be one standard of excellence,
especially when a plane is airborne. Quality planning and control is especially important when it comes to air traffic operations as customers’ lives depend
Mark 1.00 out of
on it. Which one of the following represents the second step in the quality planning and control process?
1.00


EXPECTVIEW TUTORS 1/5

, 2/18/24, 6:10 PM Assessment 4: Attempt review
Flag question Select one:
a. Identify the causes of poor quality
b. Controlling quality against set standards
c. Setting standards
d. Measuring quality characteristics



The correct answer is: Measuring quality characteristics



Question 6 Airports such as OR Tambo International must be able to deal with a short waiting tolerance as passengers experience most value-adding activities first-
Correct hand. Passengers should be able to collect baggage from terminals in a reasonable time period. This refers to the of output.
Mark 1.00 out of
1.00 Select one:
Flag question
a. variety
b. visibility
c. variation
d. volume



The correct answer is: visibility



Question 7 One of the advantages of an effective and efficient operation is that it can reduce the amount of investment needed. This is because .
Correct

Mark 1.00 out of Select one:
1.00 a. it creates a solid base of operational skills and knowledge to develop new products and services
Flag question b. increasing the effective capacity of the operation by better use of facilities may decrease the amount of capital required to run the facilities
c. sales are increased by offering superior quality products
d. the organisation has build an outstanding reputation for offering good value for money



The correct answer is: increasing the effective capacity of the operation by better use of facilities may decrease the amount of capital required to run the
facilities



Question 8 Total Quality Management (TQM) is an approach to quality which requires the entire business to be responsible for quality. Oakland’s TQM model lists
Correct various factors that should be taken into account when implementing TQM. The four Ps in this instance refer to the components of the
model.
Mark 1.00 out of
1.00
Select one:
Flag question
a. soft
b. hard
c. visible
d. management



The correct answer is: hard



Question 9 During 2019, a new 22,700m² food production facility belonging to In2food was opened in the OR Tambo Special Economic Zone in Johannesburg.
Correct Described as the largest and most diverse ultra-fresh food facility of its kind in the southern hemisphere, and the second largest C02 refrigeration facility
in the world, the new Bonaero site created 600 new jobs. Within the processing area, is housed world-class state of the art food manufacturing equipment
Mark 1.00 out of
imported from around the world as well as quality South African equipment. Failure prevention and recovery are crucial elements of the operations
1.00
processes used by the food processing industry. If the facility’s engineers use a cause-effect diagram to determine the effect of power outages on the
Flag question spoilage rates of different food stuffs, they are conducting .

Select one:
a. failure analysis
b. process-monitoring
c. failure detection
d. quality control




EXPECTVIEW TUTORS 2/5

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExpectviewTutors
View profile
Follow You need to be logged in order to follow users or courses
Sold
964
Member since
5 year
Number of followers
636
Documents
155
Last sold
2 months ago

3,5

105 reviews

5
45
4
12
3
19
2
8
1
21

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions